Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 17, 2021, 09:53 AM
  • 05 1262_05 1261_06172021_030617.mp4

Date
06/17/2021
W/O
896358
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00518
PipeID
P06473
Time
2:53 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8987
Sewer Name
05 SO HAWTHORNE-WARFIELD AV EXT TR, SECT 4
City
REDONDO BEACH
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
19
Purpose
Routine Assessment
Project
RFIR_WO_896358_TV05332_JUN2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
24 in.
Upstream MH
05 1262
Downstream MH
05 1261
Dir. of Survey
Downstream
Length Surveyed
299.5 ft.
Total Length
299.5 ft.
Structural Index
3
Structural Quick
3K2K
Structural Rating
295
O&M Index
2
O&M Quick
2K11
O&M Rating
119
Overall Index
2
Overall Quick
Overall Rating
414
Pipe schematic from manhole 05 1262 to 05 1261
MH: 05 1262MH: 05 1261downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 05 12620 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/UNKNOWN0 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.3 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start62.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"71.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"102.9 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6"103.8 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN156.5 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6"180.9 ft. RFJ - Roots Fine Joint, from 07 to 05 o'clock, within 8 inches of joint: YES219.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN227.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN271.5 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN297 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish297 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish299.5 ft. AMH - Downstream Manhole, Survey Ends - 05 1261299.5 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE299.5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (4)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.3 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN

    103.8 ft. - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN

  • Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6"

    156.5 ft. - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6"

  • Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN

    271.5 ft. - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN

Observations (22)

DistanceCodeObservation
156.5TBA
103.8TBOPEN
299.5AMH05 1261
299.5MGOCONN @ MH 3 O'CLOCK/ACTIVE
271.5TBOPEN
0MWL
2.3CM
227.5TFOPEN
71.1TFC
299.5CM
219.6TFOPEN
297DAGS
2DAGS
0MWM
102.9TFA
0AMH05 1262
0MGOCONN @ MH 3 O'CLOCK/UNKNOWN
297SSS
0MGOCONN @ MH 9 O'CLOCK/ACTIVE
2SSS
62.6TFC
180.9RFJ

Properties (7)

additional_info
630074061621202
custom_field_three
MULTIPLE CRACKS
custom_field_two
3
customer
1
datetime
2021-06-17T02:53:58-07:00
documentation
PROPIPE
is_lateral_inspection
false