Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 23, 2021, 07:47 AM
  • 18 0002_18 0001_06232021_005959.mp4

Date
06/23/2021
W/O
896583
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00713
PipeID
P13817
Time
12:47 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9051
Sewer Name
18 WALNUT WAY TRUNK
City
WHITTIER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
20
Purpose
Routine Assessment
Project
RFIR_WO_896583_TV18059_JUN2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
18 0002
Downstream MH
18 0001
Dir. of Survey
Downstream
Length Surveyed
351.2 ft.
Total Length
351.2 ft.
Structural Index
3
Structural Quick
3M2M
Structural Rating
350
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
350
Pipe schematic from manhole 18 0002 to 18 0001
MH: 18 0002MH: 18 0001downstream0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 18 00020 ft. MWL - Water Level, 15 %of cross sectional area2.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.9 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start19.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"50 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"89.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"107.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"116.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"147 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"201.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"226.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"250.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"293 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"329.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"341.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"351.1 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish351.2 ft. AMH - Downstream Manhole, Survey Ends - 18 0001351.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (2)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.9 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.9 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (20)

DistanceCodeObservation
147TF
351.1SAV
2.9SSS
226.1TF
0MWM
329.3TF
250.6TF
89.4TF
351.2AMH18 0001
293TF
0AMH18 0002
0MWL
19.7TF
116.9TF
201.7TF
351.2SSS
50TF
341.6TF
107.7TF
2.9SAV

Properties (7)

additional_info
630074062221201
custom_field_three
AGGREGATE VISIBLE/SPALLING
custom_field_two
2
customer
1
datetime
2021-06-23T00:47:26-07:00
documentation
PROPIPE
is_lateral_inspection
false