Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 22, 2021, 09:15 AM
  • 18 0023_18 0022_06222021_022346.mp4

Date
06/22/2021
W/O
896583
Weather
Dry
Operator/Surveyor
N.ZAHREDDINE
Sewer ID
Z00713
PipeID
P13839
Time
2:15 AM
Certificate
U-109-7948
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8534
Sewer Name
18 WALNUT WAY TRUNK
City
WHITTIER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
15
Purpose
Routine Assessment
Project
RFIR_WO_896583_TV18059_JUN2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
18 0023
Downstream MH
18 0022
Dir. of Survey
Downstream
Length Surveyed
32.5 ft.
Total Length
32.5 ft.
Structural Index
3
Structural Quick
3500
Structural Rating
15
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
15
Pipe schematic from manhole 18 0023 to 18 0022
MH: 18 0023MH: 18 0022downstream0 ft. MGO - General Observation - CONNECTION AT THE MH 9 OC'LOCK0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 18 00232.5 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start29.6 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish32.5 ft. MGO - General Observation - CONNECTION AT THE MH 3 OC'LOCK32.5 ft. AMH - Downstream Manhole, Survey Ends - 18 0022

Observation photos (1)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.5 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (8)

DistanceCodeObservation
2.5SAV
0MGOCONNECTION AT THE MH 9 OC'LOCK
0MWM
0MWL
0AMH18 0023
32.5MGOCONNECTION AT THE MH 3 OC'LOCK
29.6SAV
32.5AMH18 0022

Properties (7)

additional_info
630074062121201
custom_field_three
AGGREGATE VISIBLE
custom_field_two
3
customer
1
datetime
2021-06-22T02:15:23-07:00
documentation
PROPIPE
is_lateral_inspection
false