Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 23, 2021, 05:43 AM
  • 18 0014_18 0013_06222021_225303.mp4

Date
06/22/2021
W/O
896583
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00713
PipeID
P13830
Time
10:43 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9051
Sewer Name
18 WALNUT WAY TRUNK
City
WHITTIER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
21
Purpose
Routine Assessment
Project
RFIR_WO_896583_TV18059_JUN2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
18 0014
Downstream MH
18 0013
Dir. of Survey
Downstream
Length Surveyed
220 ft.
Total Length
220 ft.
Structural Index
3
Structural Quick
4G3H
Structural Rating
300
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
300
Pipe schematic from manhole 18 0014 to 18 0013
MH: 18 0014MH: 18 0013downstream0 ft. AMH - Upstream Manhole, Survey Begins - 18 00140 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT THE MH 3 OC'LOCK CAPPED2.4 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start14.3 ft. FM - Fracture Multiple, from 08 to 01 o'clock, within 8 inches of joint: YES17.2 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start46.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"65.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"100.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"120 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"145.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"150 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"211.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"219.9 ft. MGO - General Observation - CONNECTION AT THE MH 9 OC'LOCK CAPPED219.9 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish219.9 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish220 ft. AMH - Downstream Manhole, Survey Ends - 18 0013

Observation photos (3)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.4 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Fracture Multiple, from 08 to 01 o'clock, within 8 inches of joint: YES

    14.3 ft. - Fracture Multiple, from 08 to 01 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    17.2 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (18)

DistanceCodeObservation
0AMH18 0014
145.6TF
219.9MGOCONNECTION AT THE MH 9 OC'LOCK CAPPED
100.5TF
14.3FM
0MWL
220AMH18 0013
120TF
65.3TF
219.9FM
150TF
2.4SAV
211.2TF
46.1TF
0MWM
0MGOCONNECTION AT THE MH 3 OC'LOCK CAPPED
17.2FM
219.9SAV

Properties (7)

additional_info
630074062221201
custom_field_three
AGGREGATE VISIBLE/ FRACTURE'S
custom_field_two
2
customer
1
datetime
2021-06-22T22:43:21-07:00
documentation
PROPIPE
is_lateral_inspection
false