Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 23, 2021, 06:01 AM
  • 18 0012_18 0011_06222021_231204.mp4

Date
06/22/2021
W/O
896583
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00713
PipeID
P13828
Time
11:01 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9051
Sewer Name
18 WALNUT WAY TRUNK
City
WHITTIER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
20
Purpose
Routine Assessment
Project
RFIR_WO_896583_TV18059_JUN2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
18 0012
Downstream MH
18 0011
Dir. of Survey
Downstream
Length Surveyed
196.2 ft.
Total Length
196.2 ft.
Structural Index
3
Structural Quick
4C3G
Structural Rating
205
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
207
Pipe schematic from manhole 18 0012 to 18 0011
MH: 18 0012MH: 18 0011downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 18 00120 ft. MWM - Water Mark, 15 %of cross sectional area0.1 ft. MGO - General Observation - CONNECTION AT THE MH 3 OC'LOCK CAPPED2.6 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start5.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"6 ft. FM - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES21.5 ft. OBJ - Obstacles In Joint, 5 %of cross sectional area, at 07 o'clock27 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"30.4 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start74.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"78.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"132.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"136 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"137.3 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish180.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"196.1 ft. MGO - General Observation - CONNECTION AT THE MH 9 OC'LOCK CAPPED196.1 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish196.2 ft. AMH - Downstream Manhole, Survey Ends - 18 0011

Observation photos (4)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.6 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

    6 ft. - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

  • Obstacles In Joint, 5 %of cross sectional area, at 07 o'clock

    21.5 ft. - Obstacles In Joint, 5 %of cross sectional area, at 07 o'clock

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    30.4 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (19)

DistanceCodeObservation
196.2AMH18 0011
30.4FM
196.1MGOCONNECTION AT THE MH 9 OC'LOCK CAPPED
74.4TF
0.1MGOCONNECTION AT THE MH 3 OC'LOCK CAPPED
0MWL
21.5OBJ
78.5TF
132.4TF
6FM
137.3FM
5.6TF
136TF
196.1SAV
180.3TF
27TF
0AMH18 0012
2.6SAV
0MWM

Properties (7)

additional_info
630074062221201
custom_field_three
AGGREGATE VISIBLE/ FRACTURE'S
custom_field_two
2
customer
1
datetime
2021-06-22T23:01:39-07:00
documentation
PROPIPE
is_lateral_inspection