Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 15, 2021, 05:06 AM
  • H 0353A_H 0353_07142021_224941.mp4

Date
07/14/2021
W/O
901485
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00176
PipeID
P10803
Time
10:06 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9078
Sewer Name
H JOINT OUTFALL H - UNIT 4 RELIEF
City
PICO RIVERA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
19A
Purpose
Routine Assessment
Project
RFIR_WO_901485_TV02375_JUL2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
63 in.
Width
63 in.
Upstream MH
H 0353A
Downstream MH
H 0353
Dir. of Survey
Downstream
Length Surveyed
445 ft.
Total Length
445 ft.
Structural Index
3
Structural Quick
3Q2Q
Structural Rating
440
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
440
Pipe schematic from manhole H 0353A to H 0353
MH: H 0353AMH: H 0353downstream0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 45 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - H 0353A0 ft. MGO - General Observation - CONNECTION AT THE MH 3 OC'LOCK2.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start57 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"118.1 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"152.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"441.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish442.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish445 ft. AMH - Downstream Manhole, Survey Ends - H 0353

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (12)

DistanceCodeObservation
152.8TF
0MWL
445AMHH 0353
57TF
0MWM
442.5SAP
0AMHH 0353A
118.1TFA
2.1SAP
441.4SSS
0MGOCONNECTION AT THE MH 3 OC'LOCK
2.1SSS

Properties (7)

additional_info
630074071421201
custom_field_three
SURFACE SPALLING/AGGREGATE PROJECTING
custom_field_two
2
customer
1
datetime
2021-07-14T22:06:06-07:00
documentation
PROPIPE
is_lateral_inspection
false