Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 24, 2017, 11:23 AM
  • 14 0466_14 0465 _01242017_032454.mp4

Date
01/24/2017
W/O
618867
Weather
Dry
Operator/Surveyor
S LOPEZ
Sewer ID
Z00580
PipeID
P18555
Time
3:23 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4219
Sewer Name
14 TRUNK "D"
City
LANCASTER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
21
Purpose
Routine Assessment
Project
WO_618867_TV14023_FEB2017
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
14 0466
Downstream MH
14 0465
Dir. of Survey
Downstream
Length Surveyed
342 ft.
Total Length
342 ft.
Structural Index
3
Structural Quick
3M2L
Structural Rating
338
O&M Index
2
O&M Quick
2200
O&M Rating
4
Overall Index
3
Overall Quick
Overall Rating
342
Pipe schematic from manhole 14 0466 to 14 0465
MH: 14 0466MH: 14 0465downstream0 ft. AMH - Upstream Manhole, Survey Begins - 14 04660 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start35.6 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"113.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"186.4 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"264.5 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"324.9 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: NO, 6"338 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish342 ft. AMH - Downstream Manhole, Survey Ends - 14 0465342 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish342 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"

    264.5 ft. - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"

Observations (15)

DistanceCodeObservation
113.2TFC
186.4TFC
342AMH14 0465
0AMH14 0466
2SAP
0MWL
342SAP
338SSS
342DAGS
324.9TF
35.6TFC
264.5TFC
2DAGS
0MWM
5SSS

Properties (6)

additional_info
SC306721
custom_field_two
2
customer
LACSD
datetime
2017-01-24T03:23:50-08:00
documentation
PRO PIPE
is_lateral_inspection
false