Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 24, 2017, 12:12 PM
  • 14 0464_14 0463 _01242017_041326.mp4

Date
01/24/2017
W/O
618867
Weather
Dry
Operator/Surveyor
S LOPEZ
Sewer ID
Z00580
PipeID
P18553
Time
4:12 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4219
Sewer Name
14 TRUNK "D"
City
LANCSATER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
21
Purpose
Routine Assessment
Project
WO_618867_TV14023_FEB2017
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
14 0464
Downstream MH
14 0463
Dir. of Survey
Downstream
Length Surveyed
337.6 ft.
Total Length
337.6 ft.
Structural Index
3
Structural Quick
3L2G
Structural Rating
281
O&M Index
2
O&M Quick
2L00
O&M Rating
134
Overall Index
2
Overall Quick
Overall Rating
415
Pipe schematic from manhole 14 0464 to 14 0463
MH: 14 0464MH: 14 0463downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 14 04640 ft. MWL - Water Level, 10 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start31.2 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"105.6 ft. MGO - General Observation - DEBRIS108.3 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"135.8 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start180.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"204.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"229 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"253.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"281 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"305.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"337.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish337.6 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish337.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish337.6 ft. AMH - Downstream Manhole, Survey Ends - 14 0463

Observation photos (4)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    135.8 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"

    305.6 ft. - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"

Observations (19)

DistanceCodeObservation
2SAP
105.6MGODEBRIS
337.6SAP
0MWM
281TFC
31.2TFC
229TFC
337.6SSS
0AMH14 0464
2DAGS
180.6TFC
135.8SSS
337.6DAGS
337.6AMH14 0463
0MWL
108.3TFC
204.7TFC
253.1TFC
305.6TFC

Properties (6)

additional_info
SC306721
custom_field_two
2
customer
LACSD
datetime
2017-01-24T04:12:11-08:00
documentation
PRO PIPE
is_lateral_inspection
false