Wastewater/Activity/PacpInspection/1.0Jul 14, 2021, 04:53 AM
  • 02 1723_02 1722_07132021_221443.mp4

Date
07/13/2021
W/O
901518
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00289
PipeID
P18887
Time
9:53 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9073
Sewer Name
02 MONTEREY PARK EXTENSION TRUNK
City
MONTEREY PARK
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
07
Purpose
Routine Assessment
Project
RFIR_WO_901518_TV02245_JUL2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
02 1723
Downstream MH
02 1722
Dir. of Survey
Downstream
Length Surveyed
356.8 ft.
Total Length
356.8 ft.
Structural Index
3
Structural Quick
4C3G
Structural Rating
198
O&M Index
3
O&M Quick
4132
O&M Rating
10
Overall Index
3
Overall Quick
Overall Rating
208
Pipe schematic from manhole 02 1723 to 02 1722
MH: 02 1723MH: 02 1722downstream0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT THE MH 9 OC'LOCK0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 02 17230 ft. MGO - General Observation - CONNECTION AT THE MH 3 OC'LOCK2.1 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES6.1 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start45.7 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish71.8 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"77.9 ft. CL - Crack Longitudinal, at 04 o'clock, within 8 inches of joint: YES99.9 ft. CL - Crack Longitudinal, at 08 o'clock, within 8 inches of joint: YES105.7 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start123.3 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"142.8 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"229.5 ft. IR - Infiltration Runner, from 08 to 09 o'clock, within 8 inches of joint: YES234.5 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"275.9 ft. DAGS - Deposits Attached Grease, 20 %of cross sectional area, from 07 to 05 o'clock, , within 8 inches of joint: YES277 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"296 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish296 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start345.1 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"356.8 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish356.8 ft. AMH - Downstream Manhole, Survey Ends - 02 1722356.8 ft. MGO - General Observation - CONNECTION AT THE MH 9 OC'LOCK

Observation photos (8)

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    6.1 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"

    71.8 ft. - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"

  • Crack Longitudinal, at 04 o'clock, within 8 inches of joint: YES

    77.9 ft. - Crack Longitudinal, at 04 o'clock, within 8 inches of joint: YES

  • Crack Longitudinal, at 08 o'clock, within 8 inches of joint: YES

    99.9 ft. - Crack Longitudinal, at 08 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    105.7 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Infiltration Runner, from 08 to 09 o'clock, within 8 inches of joint: YES

    229.5 ft. - Infiltration Runner, from 08 to 09 o'clock, within 8 inches of joint: YES

  • Deposits Attached Grease, 20 %of cross sectional area, from 07 to 05 o'clock,  , within 8 inches of joint: YES

    275.9 ft. - Deposits Attached Grease, 20 %of cross sectional area, from 07 to 05 o'clock, , within 8 inches of joint: YES

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    296 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (24)

DistanceCodeObservation
45.7FM
296CM
356.8FM
296FM
71.8TF
123.3TF
356.8AMH02 1722
6.1FM
99.9CL
275.9DAGS
2.1DSZ
0MWL
105.7CM
142.8TF
277TFA
345.1TF
229.5IR
0MGOCONNECTION AT THE MH 9 OC'LOCK
356.8MGOCONNECTION AT THE MH 9 OC'LOCK
0MWM
77.9CL
234.5TF
0AMH02 1723
0MGOCONNECTION AT THE MH 3 OC'LOCK

Properties (7)

additional_info
630074071321201
custom_field_three
multiple fracture's
custom_field_two
2
customer
1
datetime
2021-07-13T21:53:29-07:00
documentation
PROPIPE
is_lateral_inspection
false