Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 12, 2021, 11:20 AM
  • 02 1561_02 1560_07122021_044244.mp4

Date
07/12/2021
W/O
901519
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00230
PipeID
P03993
Time
4:20 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9070
Sewer Name
02 ARIZONA AVENUE TRUNK, SECTION 1
City
LOS ANGELES
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
12
Purpose
Routine Assessment
Project
RFIR_WO_901519_TV02004_JUL2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
12 in.
Upstream MH
02 1561
Downstream MH
02 1560
Dir. of Survey
Downstream
Length Surveyed
321.3 ft.
Total Length
321.3 ft.
Structural Index
3
Structural Quick
3L00
Structural Rating
189
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
189
Pipe schematic from manhole 02 1561 to 02 1560
MH: 02 1561MH: 02 1560downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT THE MH 3 OC'LOCK0 ft. AMH - Upstream Manhole, Survey Begins - 02 15610 ft. MGO - General Observation - CONNECTION AT THE MH 9 OC'LOCK0 ft. MWL - Water Level, 10 %of cross sectional area3.9 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start59.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"60.6 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6"100.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"141.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"146.7 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6"180.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"220.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"223.4 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6"266.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"272.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"312.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"321.3 ft. AMH - Downstream Manhole, Survey Ends - 02 1560321.3 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (4)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.9 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6"

    60.6 ft. - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6"

  • Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6"

    146.7 ft. - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6"

  • Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6"

    223.4 ft. - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6"

Observations (19)

DistanceCodeObservation
321.3AMH02 1560
180.2TF
0MWM
0MGOCONNECTION AT THE MH 3 OC'LOCK
59.9TFC
312.7TF
141.9TFC
0AMH02 1561
220.7TFC
223.4TB
0MGOCONNECTION AT THE MH 9 OC'LOCK
3.9CM
266.7TF
146.7TB
60.6TB
100.8TF
321.3CM
272.2TF
0MWL

Properties (7)

additional_info
NONE
custom_field_three
MULTIPLE CRACKS
custom_field_two
3
customer
1
datetime
2021-07-12T04:20:40-07:00
documentation
PROPIPE
is_lateral_inspection
false