Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 23, 2021, 09:22 AM
  • 4_1_2_23072021_022657.mp4

Date
07/23/2021
W/O
0901376
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00716
PipeID
P14823
Time
2:22 AM
Certificate
U-1014-06022543
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
I0319R
Sewer Name
WORSHAM CREEK TRUNK
City
WHITTIER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
11
Purpose
Maintenance Related
Project
20210723MDM_WORSHAM_CREEK_TRUNK
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Upstream MH
18 0971A
Downstream MH
18 0986
Dir. of Survey
Downstream
Length Surveyed
397.5 ft.
Total Length
397.5 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
3312
O&M Rating
11
Overall Index
2
Overall Quick
Overall Rating
11
Pipe schematic from manhole 18 0971A to 18 0986
MH: 18 0971AMH: 18 0986downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MGO - General Observation - MH CONN 9:00 ACTIVE0 ft. AMH - Upstream Manhole, Survey Begins - 2:25AM0 ft. MWL - Water Level, 5 %of cross sectional area144 ft. RFC - Roots Fine Connection, from 09 to 12 o'clock - 3%147 ft. RFC - Roots Fine Connection, from 10 to 11 o'clock - 3%199 ft. RMC - Roots Medium Connection, from 07 to 11 o'clock, 25 %, within 8 inches of joint: NO253 ft. RMC - Roots Medium Connection, from 09 to 11 o'clock, 10 %, within 8 inches of joint: NO348 ft. RMC - Roots Medium Connection, from 09 to 11 o'clock, 5 %, within 8 inches of joint: NO397.5 ft. AMH - Downstream Manhole, Survey Ends - 3:00AM

Observation photos (1)

  • Roots Medium Connection, from 07 to 11 o'clock, 25 %, within 8 inches of joint: NO

    199 ft. - Roots Medium Connection, from 07 to 11 o'clock, 25 %, within 8 inches of joint: NO

Observations (10)

DistanceCodeObservation
253RMC
144RFC3%
199RMC
0MWM
0MGOMH CONN 9:00 ACTIVE
147RFC3%
397.5AMH3:00AM
0AMH2:25AM
0MWL
348RMC

Properties (5)

customer
1
datetime
2021-07-23T02:22:24-07:00
documentation
MARTIN,OLIVER 111,BARR,RAMIREZ
is_lateral_inspection
false
lining
PVCP