Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 13, 2021, 04:16 PM
  • 1_1_1_13072021_094909.mp4

Date
07/13/2021
W/O
0901549
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00593
PipeID
P12976
Time
9:16 AM
Certificate
U-415-06024039
System Owner
1
Date Cleaned
Pre-Cleaning
Jetting
Media Label
I0316
Sewer Name
ARCADIA-SIERRA MADRE TRUNK, SECTS 2&5
City
ARCADIA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
04
Purpose
Maintenance Related
Project
20210713DF_ARCADIA_SIERRA_MADRE_TRUNK_SEC_2_5
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
15 0775
Downstream MH
15 0774
Dir. of Survey
Downstream
Length Surveyed
394.8 ft.
Total Length
394.8 ft.
Structural Index
3
Structural Quick
3O00
Structural Rating
234
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
236
Pipe schematic from manhole 15 0775 to 15 0774
MH: 15 0775MH: 15 0774downstream0 ft. MGO - General Observation - ROACHES @ MH0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 9:20 AM0 ft. MWM - Water Mark, 25 %of cross sectional area2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start43 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4"45.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4"117 ft. TFI - Tap Factory Made Intruding, at 10 o'clock, -, -, within 8 inches of joint: YES, 4", 1"122.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"200.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4"206.4 ft. TBA - Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: YES, 4"245.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4"249 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4"295.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4"298.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4"393.8 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE393.8 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish393.8 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/UNKNOWN394.8 ft. AMH - Downstream Manhole, Survey Ends - 10:25 AM

Observations (19)

DistanceCodeObservation
0MGOROACHES @ MH
0MWL
393.8MGOCONN @ MH 3 O'CLOCK/ACTIVE
245.9TF
2SAV
393.8SAV
394.8AMH10:25 AM
43TF
45.7TF
117TFI
206.4TBA
298.2TF
393.8MGOCONN @ MH 3 O'CLOCK/UNKNOWN
0AMH9:20 AM
295.7TF
0MWM
249TF
200.2TF
122.7TFC

Properties (5)

custom_field_two
3
customer
1
datetime
2021-07-13T09:16:36-07:00
documentation
FRANKLIN, IGNACIO, CASTILLO
is_lateral_inspection
false