B 0045A_B 0045_2262016_080443.mp4
0 ft. - Water Level, 20 %of cross sectional area
0 ft. - Upstream Manhole, Survey Begins - 8:03 AM
2 ft. - General Observation - LINED FROM 10 TO 02 O'CLOCK
2 ft. - Surface Aggregate Visible, from 02 to 10 o'clock, within 8 inches of joint: NO
2 ft. - Surface Spalling, from 02 to 10 o'clock, within 8 inches of joint: NO
2.1 ft. - Upstream Manhole, Survey Ends - ABLE TO SEE MH. B 45
| Distance | Code | Observation |
|---|---|---|
| 0 | MWL | — |
| 2 | MGO | LINED FROM 10 TO 02 O'CLOCK |
| 2 | SAV | — |
| 2.1 | AMH | ABLE TO SEE MH. B 45 |
| 0 | AMH | 8:03 AM |
| 2 | SSS | — |