15 0775_15 0774_2252016_005511.mp4
2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
8.5 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE
8.5 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AQGG
31.9 ft. - Surface Aggregate Missing, from 12 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG PEELING CONCRETE
74.2 ft. - Roots Medium Joint, from 08 to 04 o'clock, 35 %, within 8 inches of joint: YESR - FINE ROOTS
81.8 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE
109.1 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG
134.7 ft. - Roots Ball Joint, from 07 to 04 o'clock, 75 %, within 8 inches of joint: YESR
134.7 ft. - General Photograph
| Distance | Code | Observation |
|---|---|---|
| 31.9 | SAM | SEVERE AGG PEELING CONCRETE |
| 95.5 | TFD | Open-95% ROOTS |
| 95.5 | RMC | — |
| 50.1 | RFJ | 3% |
| 0 | AMH | 12:45AM |
| 0 | MGO | Conn. @ Mh, 9 O' Clock. Active |
| 74.2 | RMJ | FINE ROOTS |
| 135.3 | SAM | SEVERE AGG |
| 81.8 | SSS | PEELING CONCRETE |
| 8.5 | SSS | PEELING CONCRETE |
| 135.6 | MSA | 60% ROOTS |
| 0 | MWM | — |
| 2 | SAP | SEVERE AGG |
| 134.7 | RBJ | — |
| 134.7 | MGP | — |
| 109.1 | SAM | SEVERE AGG |
| 135.3 | SSS | PEELING CONCRETE |
| 135.3 | SAP | SEVERE AGG |
| 0 | MGO | Conn. @ Mh, 3 O' Clock. Active |
| 0 | MWL | — |
| 8.5 | SAM | SEVERE AQGG |
| 99.4 | TF | Capped |