Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 17, 2016, 04:58 PM
  • A 0587_A 0586_2172016_090458.mp4

Date
02/17/2016
W/O
0541683
Weather
Dry
Operator/Surveyor
MIRANDA
Sewer ID
Z00316
PipeID
P07792
Time
8:58 AM
Certificate
U-1014-06022542
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7052
Sewer Name
A JOA-1A DISTRICT 21 INTERCEPTOR
City
LA PUENTE
Loc. details
Other
Location Code
Z
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
34
Purpose
Capital Improvement Program Assesment
Project
20160216AM_JOA_1A_DISTRICT_21_INTERCEPTOR
Material
Reinforced Concrete Pipe
Shape
Circular
Height
72 in.
Upstream MH
A 0587
Downstream MH
A 0586
Dir. of Survey
Downstream
Length Surveyed
2.1 ft.
Total Length
2.1 ft.
Structural Index
3
Structural Quick
5131
Structural Rating
10
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
10
Pipe schematic from manhole A 0587 to A 0586
MH: A 0587MH: A 0586downstream0 ft. AMH - Upstream Manhole, Survey Begins - 9:03 AM0 ft. MWL - Water Level, 100 %of cross sectional area0 ft. MGO - General Observation - AIRLINE2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: NO2 ft. RPZ - Repair Other, within 8 inches of joint: NO - LINER PATCH2 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: NO2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO2.1 ft. MSA - Survey Abandoned - VIEW OF THE DOWNLEG PIPE OF THE U/S SIPHON

Observation photos (6)

  • Upstream Manhole, Survey Begins - 9:03 AM

    0 ft. - Upstream Manhole, Survey Begins - 9:03 AM

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: NO

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: NO

  • Repair Other, within 8 inches of joint: NO - LINER PATCH

    2 ft. - Repair Other, within 8 inches of joint: NO - LINER PATCH

  • Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: NO

    2 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: NO

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO

  • Survey Abandoned - VIEW OF THE DOWNLEG PIPE OF THE U/S SIPHON

    2.1 ft. - Survey Abandoned - VIEW OF THE DOWNLEG PIPE OF THE U/S SIPHON

Observations (8)

DistanceCodeObservation
2SAV
2RPZLINER PATCH
2SRV
2SSS
2.1MSAVIEW OF THE DOWNLEG PIPE OF THE U/S SIPHON
0AMH9:03 AM
0MWL
0MGOAIRLINE

Properties (7)

additional_info
RFIR INSPECTION, VIEW OF THE DOWNLEG PIPE OF THE U/S SIPHON
custom_field_three
REBAR, SPALLING, SEV. EXP. AGGREGATE
custom_field_two
1
customer
LACSD
datetime
2016-02-17T08:58:27-08:00
documentation
MIRANDA, FRANKLIN, SHADLER, MIRABAL
is_lateral_inspection
false