Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 11, 2016, 08:38 AM
  • A 0307_A 0306_2112016_020016.mp4

Date
02/11/2016
W/O
0556813
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00325
PipeID
P08217
Time
12:38 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0049
Sewer Name
A JOA-1A SAN JOSE CREEK WRP INTERCEPTOR
City
EL MONTE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
29
Purpose
Routine Assessment
Project
20160211MDM_JOA_1A_SAN_JOSE_CREEK_WRP_INTERCEPTOR
Material
Reinforced Concrete Pipe
Shape
Circular
Height
63 in.
Upstream MH
A 0307
Downstream MH
A 0306
Dir. of Survey
Downstream
Length Surveyed
216.8 ft.
Total Length
216.8 ft.
Structural Index
3
Structural Quick
5134
Structural Rating
19
O&M Index
5
O&M Quick
5241
O&M Rating
14
Overall Index
4
Overall Quick
Overall Rating
33
Pipe schematic from manhole A 0307 to A 0306
MH: A 0307MH: A 0306downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 1:35AM2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - PEELING SWOLLEN LAITANCE COAT8 ft. MGO - General Observation - MASTIC ON JOINT SLIGHT PEELING14.9 ft. MGO - General Observation - PEELING MASTIC21.4 ft. MGO - General Observation - HANGING & PEELING MASTIC AT JOINTS ATART26.4 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - VERY SPORATIC SEVERE AGG51.5 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES - SEVERE AGG SPORATIC125.8 ft. MGO - General Observation - PEELING HANGING MASTIC AT JOINTS134.4 ft. MWM - Water Mark, 80 %of cross sectional area148.5 ft. SAV - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: YES161.4 ft. SAV - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG161.4 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish170.2 ft. MGO - General Observation - HANGING MASTIC JOINTS200 ft. MWL - Water Level, 60 %of cross sectional area200 ft. MWM - Water Mark, 90 %of cross sectional area206.4 ft. MGO - General Observation - PEELING MASTIC JOINT COVERED216.4 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING LAITANCE COAT216.4 ft. MGO - General Observation - MASTIC PEELING & HANGING AT JOINTS FINISH216.4 ft. SAV - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG216.4 ft. SRC - Surface Reinforcement Corroded, from 11 to 12 o'clock, within 8 inches of joint: NO - CIRCUM REBAR SURFACE REBAR216.4 ft. MGP - General Photograph216.8 ft. MSA - Survey Abandoned - DOWNLEG UPSTREAM SIPHON

Observation photos (16)

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - PEELING SWOLLEN LAITANCE COAT

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - PEELING SWOLLEN LAITANCE COAT

  • General Observation - MASTIC ON JOINT SLIGHT PEELING

    8 ft. - General Observation - MASTIC ON JOINT SLIGHT PEELING

  • General Observation - PEELING MASTIC

    14.9 ft. - General Observation - PEELING MASTIC

  • General Observation - HANGING & PEELING MASTIC AT JOINTS ATART

    21.4 ft. - General Observation - HANGING & PEELING MASTIC AT JOINTS ATART

  • Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - VERY SPORATIC SEVERE AGG

    26.4 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - VERY SPORATIC SEVERE AGG

  • Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES - SEVERE AGG SPORATIC

    51.5 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES - SEVERE AGG SPORATIC

  • General Observation - PEELING HANGING MASTIC AT JOINTS

    125.8 ft. - General Observation - PEELING HANGING MASTIC AT JOINTS

  • Water Mark, 80 %of cross sectional area

    134.4 ft. - Water Mark, 80 %of cross sectional area

  • Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: YES

    148.5 ft. - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: YES

  • Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    161.4 ft. - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • General Observation - HANGING MASTIC JOINTS

    170.2 ft. - General Observation - HANGING MASTIC JOINTS

  • Water Mark, 90 %of cross sectional area

    200 ft. - Water Mark, 90 %of cross sectional area

  • General Observation - PEELING MASTIC JOINT COVERED

    206.4 ft. - General Observation - PEELING MASTIC JOINT COVERED

  • Surface Reinforcement Corroded, from 11 to 12 o'clock, within 8 inches of joint: NO - CIRCUM REBAR SURFACE REBAR

    216.4 ft. - Surface Reinforcement Corroded, from 11 to 12 o'clock, within 8 inches of joint: NO - CIRCUM REBAR SURFACE REBAR

  • General Photograph

    216.4 ft. - General Photograph

  • Survey Abandoned - DOWNLEG UPSTREAM SIPHON

    216.8 ft. - Survey Abandoned - DOWNLEG UPSTREAM SIPHON

Observations (24)

DistanceCodeObservation
200MWL
216.8MSADOWNLEG UPSTREAM SIPHON
21.4MGOHANGING & PEELING MASTIC AT JOINTS ATART
161.4SAVSEVERE AGG
0MWL
0MWM
134.4MWM
51.5SAVSEVERE AGG SPORATIC
216.4SSSBLISTERING PEELING LAITANCE COAT
148.5SAV
206.4MGOPEELING MASTIC JOINT COVERED
2SSSPEELING SWOLLEN LAITANCE COAT
216.4MGOMASTIC PEELING & HANGING AT JOINTS FINISH
216.4SAVSEVERE AGG
125.8MGOPEELING HANGING MASTIC AT JOINTS
161.4SAV
14.9MGOPEELING MASTIC
200MWM
8MGOMASTIC ON JOINT SLIGHT PEELING
216.4SRCCIRCUM REBAR SURFACE REBAR
216.4MGP
26.4SAVVERY SPORATIC SEVERE AGG
170.2MGOHANGING MASTIC JOINTS
0AMH1:35AM

Properties (6)

custom_field_three
SEVERE AGG VISIBLE 1 AREA CORRODED SURFACE REBAR C
custom_field_two
3
customer
LACSD
datetime
2016-02-11T00:38:56-08:00
documentation
MARTIN,MANANES,REVELES,OLIVER 111
is_lateral_inspection
false