05 0397_05 0396_2102016_100414.mp4
0 ft. - Water Mark, 45 %of cross sectional area
0 ft. - Upstream Manhole, Survey Begins - 10:03 AM
0 ft. - Water Level, 30 %of cross sectional area
2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO, Start
126.9 ft. - Surface Aggregate Visible, at 12 o'clock, within 8 inches of joint: NO
162.3 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: NO
187.6 ft. - Surface Aggregate Visible, at 09 o'clock, within 8 inches of joint: NO
306.9 ft. - General Photograph - SPALLING
361.3 ft. - Tap Factory Made Active, at 01 o'clock, -, within 8 inches of joint: NO, 6"
367.8 ft. - General Photograph - SPALLING
412.2 ft. - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: NO, 6" - OPEN
426.5 ft. - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: NO, 6" - OPEN
470.8 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO, Finish
| Distance | Code | Observation |
|---|---|---|
| 412.2 | TF | OPEN |
| 0 | MWM | — |
| 470.8 | SSS | — |
| 426.5 | TF | OPEN |
| 2 | SSS | — |
| 471.2 | AMH | 10:50 AM |
| 126.9 | SAV | — |
| 162.3 | SAV | — |
| 361.3 | TFA | — |
| 187.6 | SAV | — |
| 367.8 | MGP | SPALLING |
| 0 | AMH | 10:03 AM |
| 470.8 | MGO | ROACHES INSIDE THE MH. |
| 470.8 | MGO | EXP. AGG. SPORADICALLY THROUGHOUT THE REACH |
| 0 | MWL | — |
| 306.9 | MGP | SPALLING |