18 0466_18 0465_252016_043015.mp4
2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - PEELING BLISTERING CONCRETE
2 ft. - General Observation - MAG COAT70% START 9:00 TO 3:00 START
2 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC
2.3 ft. - Surface Reinforcement Visible, from 02 to 03 o'clock, within 8 inches of joint: YES - CIRCUM REBAR
30 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - PEELING CONCRETE
30 ft. - Surface Aggregate Projecting, from 02 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG
36 ft. - General Observation - MAG COAT 70% FINISH
41.7 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - PEELING CONCRETE
82 ft. - Deposits Settled Other, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES - POSIIBLE PIECE CONCRETE
82 ft. - Water Level, 5 %of cross sectional area
107.6 ft. - Surface Reinforcement Visible, from 02 to 03 o'clock, within 8 inches of joint: YES - CIRCUM REBAR
107.6 ft. - Surface Aggregate Projecting, from 02 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG
147.4 ft. - Surface Reinforcement Visible, from 02 to 03 o'clock, within 8 inches of joint: YES - CIRCUM REBAR
161.4 ft. - Surface Reinforcement Visible, from 12 to 03 o'clock, within 8 inches of joint: YES, Start - LONG CIRCUM REBAR
161.9 ft. - General Photograph
202.9 ft. - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: NO - CIRCUM REBAR
206.9 ft. - Surface Reinforcement Visible, from 09 to 11 o'clock, within 8 inches of joint: YES, Start - CIRCUM REBAR
236.8 ft. - Surface Reinforcement Visible, from 09 to 11 o'clock, within 8 inches of joint: YES - CIRCUM
237.8 ft. - Surface Reinforcement Visible, from 02 to 03 o'clock, within 8 inches of joint: YES, Start - CIRCUM REBAR
241.9 ft. - Surface Reinforcement Visible, at 02 o'clock, within 8 inches of joint: NO - LONG REBAR
246.5 ft. - Surface Reinforcement Corroded, from 09 to 11 o'clock, within 8 inches of joint: YES, Start - CIRCUM LONG REBAR
248.7 ft. - General Photograph - CORRODED REBAR
254.1 ft. - Surface Reinforcement Visible, from 01 to 03 o'clock, within 8 inches of joint: YES - CIRCUM REBAR
267.3 ft. - Surface Reinforcement Visible, from 10 to 03 o'clock, within 8 inches of joint: YES, Start - LONG CIRCUM REBAR
277.3 ft. - Surface Reinforcement Visible, from 11 to 03 o'clock, within 8 inches of joint: YES - CIRCUM REBAR
285.6 ft. - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: YES, Start - LONG CIRCUM REBAR
| Distance | Code | Observation |
|---|---|---|
| 246.6 | SRV | — |
| 41.7 | SSS | PEELING CONCRETE |
| 267.3 | SRV | LONG CIRCUM REBAR |
| 291.9 | SRV | — |
| 236.8 | SRV | CIRCUM |
| 0 | MWL | — |
| 82 | DSZ | POSIIBLE PIECE CONCRETE |
| 0 | AMH | 4:20AM |
| 293.4 | SSS | — |
| 2 | SSS | PEELING BLISTERING CONCRETE |
| 237.8 | SRV | CIRCUM REBAR |
| 285.6 | SRV | LONG CIRCUM REBAR |
| 254.1 | SRC | — |
| 2.3 | SRV | CIRCUM REBAR |
| 82 | MWL | — |
| 107.6 | SRV | CIRCUM REBAR |
| 213.7 | SRV | — |
| 30 | SSS | PEELING CONCRETE |
| 246.5 | SRC | CIRCUM LONG REBAR |
| 166.2 | SRV | — |
| 202.9 | SRV | CIRCUM REBAR |
| 58.3 | DSZ | POSSIBLE ROCK |
| 161.4 | SRV | LONG CIRCUM REBAR |
| 2 | MGO | MAG COAT70% START 9:00 TO 3:00 START |
| 248.7 | MGP | CORRODED REBAR |
| 272.7 | SRV | — |
| 30 | SAP | SEVERE AGG |
| 107.6 | SAP | SEVERE AGG |
| 161.9 | MGP | — |
| 293.4 | SAV | — |
| 277.3 | SRV | CIRCUM REBAR |
| 254.1 | SRV | CIRCUM REBAR |
| 147.4 | SRV | CIRCUM REBAR |
| 36 | MGO | MAG COAT 70% FINISH |
| 241.9 | SRV | LONG REBAR |
| 206.9 | SRV | CIRCUM REBAR |
| 0 | MWM | — |
| 293.8 | AMH | 5:25AM |
| 2 | SAV | SEVERE AGG SPORATIC |
| 41.7 | MWL | — |