Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 5, 2016, 11:17 AM
  • 18 0467_18 0466_252016_032133.mp4

Date
02/05/2016
W/O
0547024
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00691
PipeID
P14321
Time
3:17 AM
Certificate
U-1014-06022254
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0043
Sewer Name
18 NORTH PLANT OUTFALL TRUNK
City
WHITTIER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
14
Purpose
Capital Improvement Program Assesment
Project
20160205MDM_NORTH_PLANT_OUTFALL_TRUNK
Material
NRCP
Shape
Circular
Height
21 in.
Upstream MH
18 0467
Downstream MH
18 0466
Dir. of Survey
Downstream
Length Surveyed
278.8 ft.
Total Length
278.8 ft.
Structural Index
4
Structural Quick
5435
Structural Rating
39
O&M Index
5
O&M Quick
5141
O&M Rating
9
Overall Index
4
Overall Quick
Overall Rating
48
Pipe schematic from manhole 18 0467 to 18 0466
MH: 18 0467MH: 18 0466downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 80 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 3:20AM2 ft. MGO - General Observation - MAG COAT 90% 10:00 TO 2:00 START2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING BLISTERING CONCRETE10.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG11.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - OPEN14 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG14 ft. SAP - Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG UNDER MAG COAT43.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open68.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open94.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish94.5 ft. MWM - Water Mark, 50 %of cross sectional area94.5 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 6" - Open94.5 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC94.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG94.5 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - PEELING BLISTERING CONCRETE116.2 ft. SRV - Surface Reinforcement Visible, from 01 to 03 o'clock, within 8 inches of joint: YES - CIRCUM REBAR122.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Active124.4 ft. SRV - Surface Reinforcement Visible, from 02 to 03 o'clock, within 8 inches of joint: YES, Start - CIRCUM REBAR127.1 ft. SRV - Surface Reinforcement Visible, from 02 to 03 o'clock, within 8 inches of joint: NO - CIRCUM REBAR132.7 ft. MGO - General Observation - MAG COAT25% 9:00 TO 3:00 START132.7 ft. SRV - Surface Reinforcement Visible, from 02 to 03 o'clock, within 8 inches of joint: YES, Finish - CIRCUM145.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open184.2 ft. SRV - Surface Reinforcement Visible, from 01 to 02 o'clock, within 8 inches of joint: NO - CIRCUM194.8 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG211 ft. MGO - General Observation - MAG COAT 50% START278.3 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - PEELING BLISTERING CONCRETE278.3 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG278.3 ft. MGO - General Observation - MAG COAT 50% FINISH278.8 ft. AMH - Downstream Manhole, Survey Ends - 4:10AM

Observation photos (14)

  • General Observation - MAG COAT 90% 10:00 TO 2:00 START

    2 ft. - General Observation - MAG COAT 90% 10:00 TO 2:00 START

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING BLISTERING CONCRETE

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING BLISTERING CONCRETE

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    10.3 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

    14 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG UNDER MAG COAT

    14 ft. - Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG UNDER MAG COAT

  • Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC

    94.5 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - PEELING BLISTERING CONCRETE

    94.5 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - PEELING BLISTERING CONCRETE

  • Surface Reinforcement Visible, from 01 to 03 o'clock, within 8 inches of joint: YES - CIRCUM REBAR

    116.2 ft. - Surface Reinforcement Visible, from 01 to 03 o'clock, within 8 inches of joint: YES - CIRCUM REBAR

  • Surface Reinforcement Visible, from 02 to 03 o'clock, within 8 inches of joint: YES, Start - CIRCUM REBAR

    124.4 ft. - Surface Reinforcement Visible, from 02 to 03 o'clock, within 8 inches of joint: YES, Start - CIRCUM REBAR

  • Surface Reinforcement Visible, from 02 to 03 o'clock, within 8 inches of joint: NO - CIRCUM REBAR

    127.1 ft. - Surface Reinforcement Visible, from 02 to 03 o'clock, within 8 inches of joint: NO - CIRCUM REBAR

  • General Observation - MAG COAT25% 9:00 TO 3:00 START

    132.7 ft. - General Observation - MAG COAT25% 9:00 TO 3:00 START

  • Surface Reinforcement Visible, from 01 to 02 o'clock, within 8 inches of joint: NO - CIRCUM

    184.2 ft. - Surface Reinforcement Visible, from 01 to 02 o'clock, within 8 inches of joint: NO - CIRCUM

  • Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG

    194.8 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • General Observation - MAG COAT 50% START

    211 ft. - General Observation - MAG COAT 50% START

Observations (31)

DistanceCodeObservation
127.1SRVCIRCUM REBAR
184.2SRVCIRCUM
94.5SSS
0MWL
132.7MGOMAG COAT25% 9:00 TO 3:00 START
14SAPSEVERE AGG
194.8SAVSEVERE AGG
145.4TFOpen
211MGOMAG COAT 50% START
94.5MWM
0MWM
124.4SRVCIRCUM REBAR
11.6TFOPEN
0AMH3:20AM
94.5TFOpen
278.8AMH4:10AM
94.5SAVSEVERE AGG SPORATIC
278.3SSSPEELING BLISTERING CONCRETE
2MGOMAG COAT 90% 10:00 TO 2:00 START
278.3SAVSEVERE AGG
116.2SRVCIRCUM REBAR
10.3SAPSEVERE AGG
14SAPSEVERE AGG UNDER MAG COAT
132.7SRVCIRCUM
278.3MGOMAG COAT 50% FINISH
94.5SAPSEVERE AGG
68.8TFOpen
43.9TFOpen
122.1TFActive
94.5SSSPEELING BLISTERING CONCRETE
2SSSPEELING BLISTERING CONCRETE

Properties (6)

custom_field_three
CIRCUM REBAR VISIBLE-SEVERE AGG PROJECTING
custom_field_two
2
customer
LACSD
datetime
2016-02-05T03:17:16-08:00
documentation
MARTIN,MANANES
is_lateral_inspection
false