05 2159_05 2097_242016_043250.mp4
2 ft. - General Observation - MAG COAT 80% 9:00 TO 3:00 START
2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING LAITANCE COAT
36 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start
103 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES - BLISTERING LAITANCE COAT
168 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - PEELING LAITANCE COAT
397 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - LAITANCE COAT PEELING
| Distance | Code | Observation |
|---|---|---|
| 103 | SSS | BLISTERING LAITANCE COAT |
| 425.2 | SSS | — |
| 425.2 | DAGS | — |
| 397 | SSS | LAITANCE COAT PEELING |
| 168 | SSS | PEELING LAITANCE COAT |
| 2 | MGO | MAG COAT 80% 9:00 TO 3:00 START |
| 0 | MWL | — |
| 425.5 | AMH | 5:30AM |
| 0 | MWM | — |
| 2 | SSS | BLISTERING PEELING LAITANCE COAT |
| 0 | AMH | 4:30AM |
| 36 | DAGS | — |