Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 1, 2016, 09:49 AM
  • 05 0632_05 0631_212016_031203.mp4

Date
02/01/2016
W/O
0536424
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00509
PipeID
P05857
Time
1:49 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0037
Sewer Name
05 PRAIRIE AVENUE TRUNK
City
INGLEWOOD
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
05
Purpose
Routine Assessment
Project
20160201MDM_PRAIRIE_AVENUE_TRUNK
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Upstream MH
05 0632
Downstream MH
05 0631
Dir. of Survey
Downstream
Length Surveyed
534.8 ft.
Total Length
534.8 ft.
Structural Index
2
Structural Quick
2200
Structural Rating
4
O&M Index
3
O&M Quick
4534
O&M Rating
34
Overall Index
3
Overall Quick
Overall Rating
38
Pipe schematic from manhole 05 0632 to 05 0631
MH: 05 0632MH: 05 0631downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 3:05AM2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SWOLLEN BLISTERING LAITANCE COAT2 ft. DAGS - Deposits Attached Grease, 15 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start43.1 ft. MGP - General Photograph43.1 ft. DAGS - Deposits Attached Grease, 20 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start43.1 ft. DAGS - Deposits Attached Grease, 15 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish62.8 ft. DAGS - Deposits Attached Grease, 20 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES62.8 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES - PEELING LAITANCE COAT190.5 ft. DAGS - Deposits Attached Grease, 20 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish190.5 ft. MGP - General Photograph190.5 ft. DAGS - Deposits Attached Grease, 25 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start204 ft. DAGS - Deposits Attached Grease, 25 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: NO314.3 ft. DAGS - Deposits Attached Grease, 30 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start317.3 ft. MGP - General Photograph367.4 ft. DAGS - Deposits Attached Grease, 30 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: NO374 ft. MGP - General Photograph430 ft. DAGS - Deposits Attached Grease, 30 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish430 ft. DAGS - Deposits Attached Grease, 20 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start487.8 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start487.8 ft. DAGS - Deposits Attached Grease, 20 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish487.8 ft. DAGS - Deposits Attached Grease, 25 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish534.4 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish534.4 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish534.8 ft. AMH - Downstream Manhole, Survey Ends - 3:45AM

Observation photos (15)

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SWOLLEN BLISTERING LAITANCE COAT

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SWOLLEN BLISTERING LAITANCE COAT

  • Deposits Attached Grease, 15 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 15 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • General Photograph

    43.1 ft. - General Photograph

  • Deposits Attached Grease, 20 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    43.1 ft. - Deposits Attached Grease, 20 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 20 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES

    62.8 ft. - Deposits Attached Grease, 20 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES - PEELING LAITANCE COAT

    62.8 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES - PEELING LAITANCE COAT

  • General Photograph

    190.5 ft. - General Photograph

  • Deposits Attached Grease, 25 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    190.5 ft. - Deposits Attached Grease, 25 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 25 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: NO

    204 ft. - Deposits Attached Grease, 25 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: NO

  • Deposits Attached Grease, 30 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    314.3 ft. - Deposits Attached Grease, 30 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • General Photograph

    317.3 ft. - General Photograph

  • Deposits Attached Grease, 30 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: NO

    367.4 ft. - Deposits Attached Grease, 30 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: NO

  • General Photograph

    374 ft. - General Photograph

  • Deposits Attached Grease, 20 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    430 ft. - Deposits Attached Grease, 20 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 10 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    487.8 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

Observations (26)

DistanceCodeObservation
374MGP
62.8DAGS
367.4DAGS
0MWL
2SSSSWOLLEN BLISTERING LAITANCE COAT
534.4SSS
43.1MGP
487.8DAGS
0MWM
190.5DAGS
314.3DAGS
430DAGS
62.8SSSPEELING LAITANCE COAT
487.8DAGS
430DAGS
43.1DAGS
190.5MGP
2DAGS
204DAGS
0AMH3:05AM
190.5DAGS
43.1DAGS
534.8AMH3:45AM
534.4DAGS
317.3MGP
487.8DAGS

Properties (6)

custom_field_three
SPALLING LAITANCE COAT
custom_field_two
4
customer
LACSD
datetime
2016-02-01T01:49:11-08:00
documentation
MARTIN,MANANES,OLIVER 111
is_lateral_inspection
false