Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 1, 2016, 09:27 AM
  • 05 0633_05 0632_212016_021600.mp4

Date
02/01/2016
W/O
0536424
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00509
PipeID
P05858
Time
1:27 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0037
Sewer Name
05 PRAIRIE AVENUE TRUNK
City
INGLEWOOD
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
05
Purpose
Routine Assessment
Project
20160201MDM_PRAIRIE_AVENUE_TRUNK
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Upstream MH
05 0633
Downstream MH
05 0632
Dir. of Survey
Downstream
Length Surveyed
526.5 ft.
Total Length
526.5 ft.
Structural Index
2
Structural Quick
2300
Structural Rating
6
O&M Index
3
O&M Quick
4335
O&M Rating
29
Overall Index
3
Overall Quick
Overall Rating
35
Pipe schematic from manhole 05 0633 to 05 0632
MH: 05 0633MH: 05 0632downstream0 ft. AMH - Upstream Manhole, Survey Begins - 1:45AM0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SWOLLEN BLISTERING LATINACE COAT2 ft. DAGS - Deposits Attached Grease, 15 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start32.6 ft. TF - Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: YES, 6" - Active37.6 ft. DAGS - Deposits Attached Grease, 20 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start63.3 ft. DAGS - Deposits Attached Grease, 20 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish103.3 ft. DAGS - Deposits Attached Grease, 20 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start103.3 ft. DAGS - Deposits Attached Grease, 15 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish114 ft. DAGS - Deposits Attached Grease, 20 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish114 ft. MGP - General Photograph130 ft. DAGS - Deposits Attached Grease, 25 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start130 ft. MGP - General Photograph159.6 ft. DAGS - Deposits Attached Grease, 25 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: NO216.4 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO216.4 ft. DAGS - Deposits Attached Grease, 25 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish216.4 ft. DAGS - Deposits Attached Grease, 15 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start354.4 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES454.7 ft. DAGS - Deposits Attached Grease, 15 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish454.7 ft. MGP - General Photograph454.7 ft. DAGS - Deposits Attached Grease, 20 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start494 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start494 ft. DAGS - Deposits Attached Grease, 20 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish526.1 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish526.1 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish526.5 ft. AMH - Downstream Manhole, Survey Ends - 2:40AM

Observation photos (15)

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SWOLLEN BLISTERING LATINACE COAT

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SWOLLEN BLISTERING LATINACE COAT

  • Deposits Attached Grease, 15 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 15 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 20 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    37.6 ft. - Deposits Attached Grease, 20 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 20 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    103.3 ft. - Deposits Attached Grease, 20 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 20 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Finish

    114 ft. - Deposits Attached Grease, 20 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish

  • General Photograph

    114 ft. - General Photograph

  • Deposits Attached Grease, 25 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    130 ft. - Deposits Attached Grease, 25 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • General Photograph

    130 ft. - General Photograph

  • Deposits Attached Grease, 25 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: NO

    159.6 ft. - Deposits Attached Grease, 25 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: NO

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO

    216.4 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO

  • Deposits Attached Grease, 15 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    216.4 ft. - Deposits Attached Grease, 15 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES

    354.4 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES

  • General Photograph

    454.7 ft. - General Photograph

  • Deposits Attached Grease, 20 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    454.7 ft. - Deposits Attached Grease, 20 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 10 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    494 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

Observations (27)

DistanceCodeObservation
114DAGS
37.6DAGS
130DAGS
2SSSSWOLLEN BLISTERING LATINACE COAT
216.4SSS
0AMH1:45AM
63.3DAGS
454.7DAGS
0MWM
0MWL
494DAGS
103.3DAGS
526.5AMH2:40AM
216.4DAGS
526.1DAGS
114MGP
2DAGS
526.1SSS
454.7MGP
103.3DAGS
454.7DAGS
159.6DAGS
130MGP
32.6TFActive
354.4SSS
216.4DAGS
494DAGS

Properties (6)

custom_field_three
SPALLING LAITANCE COAT
custom_field_two
4
customer
LACSD
datetime
2016-02-01T01:27:38-08:00
documentation
MARTIN,MANANES,OLIVER 111
is_lateral_inspection
false