Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 15, 2021, 10:31 AM
  • B 1282_B 1281_7152021_034538.mp4

Date
07/15/2021
W/O
0896748
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z01126
PipeID
P25177
Time
3:31 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1873
Sewer Name
B JOINT OUTFALL B - UNIT 6J
City
PASADENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
12
Purpose
Capital Improvement Program Assesment
Project
20210715MDM_JOINT_OUTFALL_B_UNIT_6J
Material
NRCP
Shape
Circular
Height
18 in.
Upstream MH
B 1282
Downstream MH
B 1281
Dir. of Survey
Downstream
Length Surveyed
270.9 ft.
Total Length
270.9 ft.
Structural Index
3
Structural Quick
4225
Structural Rating
18
O&M Index
2
O&M Quick
423A
O&M Rating
60
Overall Index
2
Overall Quick
Overall Rating
78
Pipe schematic from manhole B 1282 to B 1281
MH: B 1282MH: B 1281downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 3:40AM0 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE2 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG4.4 ft. RMJ - Roots Medium Joint, from 07 to 12 o'clock, 20 %, within 8 inches of joint: YESR4.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE6.7 ft. RMJ - Roots Medium Joint, from 07 to 10 o'clock, 5 %, within 8 inches of joint: YESR8.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE SEVERE AGG ATTACHED21.7 ft. RFJ - Roots Fine Joint, from 10 to 02 o'clock, within 8 inches of joint: YESR - 2%24.4 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG24.4 ft. RMJ - Roots Medium Joint, from 07 to 11 o'clock, 10 %, within 8 inches of joint: YESR37 ft. MMC - Material Change, Vitrified clay pipe - START55.3 ft. MMC - Material Change, Vitrified clay pipe - FINISH60.4 ft. RMJ - Roots Medium Joint, at 04 o'clock, 5 %, within 8 inches of joint: YESR73.1 ft. RFJ - Roots Fine Joint, from 02 to 04 o'clock, within 8 inches of joint: YESR - 4%82.7 ft. RFB - Roots Fine Barrell, from 03 to 04 o'clock, within 8 inches of joint: YES - 3%104.3 ft. RMJ - Roots Medium Joint, from 08 to 04 o'clock, 5 %, within 8 inches of joint: YESR, Start112 ft. RMJ - Roots Medium Joint, from 08 to 04 o'clock, 10 %, within 8 inches of joint: YESR, Start112 ft. RMJ - Roots Medium Joint, from 08 to 04 o'clock, 5 %, within 8 inches of joint: YESR, Finish117.1 ft. RMJ - Roots Medium Joint, from 08 to 04 o'clock, 10 %, within 8 inches of joint: YESR, Finish124.9 ft. RFJ - Roots Fine Joint, from 08 to 11 o'clock, within 8 inches of joint: YESR - 3%142.4 ft. RFJ - Roots Fine Joint, from 08 to 12 o'clock, within 8 inches of joint: YESR - 2%142.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE SEVERE AGG ATTACHED150 ft. RMJ - Roots Medium Joint, from 08 to 04 o'clock, 5 %, within 8 inches of joint: YESR153.2 ft. RFJ - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YESR - 3%166.2 ft. RMB - Roots Medium Barrell, from 03 to 05 o'clock, 5 %, within 8 inches of joint: YES172.7 ft. RMJ - Roots Medium Joint, from 07 to 09 o'clock, 5 %, within 8 inches of joint: YESR175.3 ft. RMJ - Roots Medium Joint, from 07 to 09 o'clock, 5 %, within 8 inches of joint: YESR186.2 ft. RFB - Roots Fine Barrell, from 03 to 05 o'clock, within 8 inches of joint: NO - 3%191.9 ft. RFB - Roots Fine Barrell, from 09 to 03 o'clock, within 8 inches of joint: NO - 3%198.2 ft. RMB - Roots Medium Barrell, from 09 to 03 o'clock, 5 %, within 8 inches of joint: YES204.3 ft. RMJ - Roots Medium Joint, from 08 to 04 o'clock, 5 %, within 8 inches of joint: YESR225.4 ft. RFB - Roots Fine Barrell, from 09 to 03 o'clock, within 8 inches of joint: YES - 2%232.4 ft. RFJ - Roots Fine Joint, from 07 to 09 o'clock, within 8 inches of joint: YESR - 2%234.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELIMG CONCRETE SEVERE ATTACHED239.8 ft. RFJ - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YESR - 3%263.3 ft. RMJ - Roots Medium Joint, from 08 to 04 o'clock, 20 %, within 8 inches of joint: YESR265.4 ft. RMJ - Roots Medium Joint, from 08 to 04 o'clock, 20 %, within 8 inches of joint: YESR268.2 ft. RFJ - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YESR - 3%270.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING CONCRETE270.6 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG270.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - PEELING CONCRETE SEVERE AGG ATTACHED270.9 ft. AMH - Downstream Manhole, Survey Ends - 4:20AM

Observation photos (15)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

  • Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    2 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Roots Medium Joint, from 07 to 12 o'clock, 20 %, within 8 inches of joint: YESR

    4.4 ft. - Roots Medium Joint, from 07 to 12 o'clock, 20 %, within 8 inches of joint: YESR

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE

    4.5 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE SEVERE AGG ATTACHED

    8.2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE SEVERE AGG ATTACHED

  • Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

    24.4 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • Material Change, Vitrified clay pipe - START

    37 ft. - Material Change, Vitrified clay pipe - START

  • Roots Medium Joint, from 08 to 04 o'clock, 5 %, within 8 inches of joint: YESR, Start

    104.3 ft. - Roots Medium Joint, from 08 to 04 o'clock, 5 %, within 8 inches of joint: YESR, Start

  • Roots Medium Joint, from 08 to 04 o'clock, 10 %, within 8 inches of joint: YESR, Start

    112 ft. - Roots Medium Joint, from 08 to 04 o'clock, 10 %, within 8 inches of joint: YESR, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE SEVERE AGG ATTACHED

    142.9 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE SEVERE AGG ATTACHED

  • Roots Medium Barrell, from 03 to 05 o'clock, 5 %, within 8 inches of joint: YES

    166.2 ft. - Roots Medium Barrell, from 03 to 05 o'clock, 5 %, within 8 inches of joint: YES

  • Roots Medium Barrell, from 09 to 03 o'clock, 5 %, within 8 inches of joint: YES

    198.2 ft. - Roots Medium Barrell, from 09 to 03 o'clock, 5 %, within 8 inches of joint: YES

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELIMG CONCRETE SEVERE ATTACHED

    234.2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELIMG CONCRETE SEVERE ATTACHED

  • Roots Medium Joint, from 08 to 04 o'clock, 20 %, within 8 inches of joint: YESR

    263.3 ft. - Roots Medium Joint, from 08 to 04 o'clock, 20 %, within 8 inches of joint: YESR

  • Roots Medium Joint, from 08 to 04 o'clock, 20 %, within 8 inches of joint: YESR

    265.4 ft. - Roots Medium Joint, from 08 to 04 o'clock, 20 %, within 8 inches of joint: YESR

Observations (45)

DistanceCodeObservation
232.4RFJ2%
55.3MMCFINISH
150RMJ
124.9RFJ3%
175.3RMJ
2SSSBLISTERING PEELING CONCRETE
270.6SSSBLISTERING PEELING CONCRETE
153.2RFJ3%
268.2RFJ3%
112RMJ
4.5SSSPEELING CONCRETE
166.2RMB
186.2RFB3%
270.9AMH4:20AM
37MMCSTART
117.1RMJ
24.4SAMSEVERE AGG
21.7RFJ2%
2SAMSEVERE AGG
270.6SAMSEVERE AGG
198.2RMB
265.4RMJ
270.6SSSPEELING CONCRETE SEVERE AGG ATTACHED
142.9SSSPEELING CONCRETE SEVERE AGG ATTACHED
191.9RFB3%
0MWL
112RMJ
82.7RFB3%
0MWM
8.2SSSPEELING CONCRETE SEVERE AGG ATTACHED
60.4RMJ
6.7RMJ
0AMH3:40AM
4.4RMJ
172.7RMJ
263.3RMJ
239.8RFJ3%
73.1RFJ4%
142.4RFJ2%
0MGOConn. @ Mh, 3 O' Clock. Active
24.4RMJ
225.4RFB2%
234.2SSSPEELIMG CONCRETE SEVERE ATTACHED
104.3RMJ
204.3RMJ

Properties (6)

custom_field_three
SEVERE AGG MISSING WITH PEELING CONCRETE
custom_field_two
2
customer
LACSD
datetime
2021-07-15T03:31:14-07:00
documentation
MARTIN,OLIVER 111,REVELES,RAMIERZ
is_lateral_inspection
false