Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 14, 2021, 11:08 AM
  • C 0206_C 0603_7142021_041521.mp4

Date
07/14/2021
W/O
0896123
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00124
PipeID
P22840
Time
4:08 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1872
Sewer Name
C JOINT OUTFALL C - UNIT 3E
City
LONG BEACH
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 03
Page No.
19
Purpose
Capital Improvement Program Assesment
Project
20210713MDM_JOINT_OUTFALL_C_UNIT_3E
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Upstream MH
C 0206
Downstream MH
C 0603
Dir. of Survey
Downstream
Length Surveyed
314.7 ft.
Total Length
314.7 ft.
Structural Index
3
Structural Quick
3222
Structural Rating
10
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
10
Pipe schematic from manhole C 0206 to C 0603
MH: C 0206MH: C 0603downstream0 ft. AMH - Upstream Manhole, Survey Begins - 4:15AM0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area2 ft. MGO - General Observation - MAG COAT 80% START2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE76.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CPNCRETE89.2 ft. SAV - Surface Aggregate Visible, from 11 to 01 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC192.1 ft. SAV - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: YES - SEVERE AGG SPORATIC314.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING CONCRETE314.2 ft. MGO - General Observation - MAG COAT 80% FINISH314.7 ft. AMH - Downstream Manhole, Survey Ends - 4:40AM

Observation photos (5)

  • General Observation - MAG COAT 80% START

    2 ft. - General Observation - MAG COAT 80% START

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CPNCRETE

    76.6 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CPNCRETE

  • Surface Aggregate Visible, from 11 to 01 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC

    89.2 ft. - Surface Aggregate Visible, from 11 to 01 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC

  • Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: YES - SEVERE AGG SPORATIC

    192.1 ft. - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: YES - SEVERE AGG SPORATIC

Observations (11)

DistanceCodeObservation
2MGOMAG COAT 80% START
314.2SSSBLISTERING PEELING CONCRETE
0AMH4:15AM
314.2MGOMAG COAT 80% FINISH
76.6SSSBLISTERING PEELING CPNCRETE
192.1SAVSEVERE AGG SPORATIC
0MWM
314.7AMH4:40AM
89.2SAVSEVERE AGG SPORATIC
2SSSBLISTERING PEELING CONCRETE
0MWL

Properties (6)

custom_field_three
SEVERE AGG SPORATIC
custom_field_two
3
customer
LACSD
datetime
2021-07-14T04:08:57-07:00
documentation
MARTIN,OLIVER 111,BARR,RAMIERZ
is_lateral_inspection
false