Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 13, 2021, 11:22 AM
  • C 0414_C 0208_7132021_042551.mp4

Date
07/13/2021
W/O
0896123
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00124
PipeID
P09600
Time
4:22 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1870
Sewer Name
C JOINT OUTFALL C - UNIT 3E
City
LONG BEACH
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 03
Page No.
19
Purpose
Capital Improvement Program Assesment
Project
20210713MDM_JOINT_OUTFALL_C_UNIT_3E
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Upstream MH
C 0414
Downstream MH
C 0208
Dir. of Survey
Downstream
Length Surveyed
242.8 ft.
Total Length
242.8 ft.
Structural Index
3
Structural Quick
3222
Structural Rating
10
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
10
Pipe schematic from manhole C 0414 to C 0208
MH: C 0414MH: C 0208downstream0 ft. AMH - Upstream Manhole, Survey Begins - 4:25AM0 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area2 ft. MGO - General Observation - MAG COAT 80% START2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE3.2 ft. SAV - Surface Aggregate Visible, from 08 to 10 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG8.6 ft. SAV - Surface Aggregate Visible, from 08 to 10 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG36.6 ft. SAP - Surface Aggregate Projecting, from 08 to 10 o'clock, within 8 inches of joint: YES - SEVERE AGG167.8 ft. MGO - General Observation - MAG COAT 90%203 ft. SSS - Surface Spalling, from 12 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE242.5 ft. MGO - General Observation - MAG COAT 80% FINISH242.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING CONCRETE242.8 ft. AMH - Downstream Manhole, Survey Ends - 4:50AM

Observation photos (6)

  • General Observation - MAG COAT 80% START

    2 ft. - General Observation - MAG COAT 80% START

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

  • Surface Aggregate Visible, from 08 to 10 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    3.2 ft. - Surface Aggregate Visible, from 08 to 10 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Surface Aggregate Projecting, from 08 to 10 o'clock, within 8 inches of joint: YES - SEVERE AGG

    36.6 ft. - Surface Aggregate Projecting, from 08 to 10 o'clock, within 8 inches of joint: YES - SEVERE AGG

  • General Observation - MAG COAT 90%

    167.8 ft. - General Observation - MAG COAT 90%

  • Surface Spalling, from 12 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE

    203 ft. - Surface Spalling, from 12 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE

Observations (14)

DistanceCodeObservation
203SSSPEELING CONCRETE
0AMH4:25AM
242.8AMH4:50AM
0MGOConn. @ Mh, 3 O' Clock. Active
0MWL
242.5MGOMAG COAT 80% FINISH
3.2SAVSEVERE AGG
167.8MGOMAG COAT 90%
0MWM
8.6SAVSEVERE AGG
36.6SAPSEVERE AGG
2MGOMAG COAT 80% START
2SSSBLISTERING PEELING CONCRETE
242.5SSSBLISTERING PEELING CONCRETE

Properties (6)

custom_field_three
SEVERE AGG PROJECTNG SPORATIC -8O% MAG COAT
custom_field_two
3
customer
LACSD
datetime
2021-07-13T04:22:03-07:00
documentation
MARTIN,OLIVER 111,BARR,RAMIERZ
is_lateral_inspection
false