Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 13, 2021, 10:09 AM
  • C 0210_C 0209_7132021_031254.mp4

Date
07/13/2021
W/O
0896123
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00124
PipeID
P09602
Time
3:09 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1870
Sewer Name
C JOINT OUTFALL C - UNIT 3E
City
LONG BEACH
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 03
Page No.
19
Purpose
Capital Improvement Program Assesment
Project
20210713MDM_JOINT_OUTFALL_C_UNIT_3E
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Upstream MH
C 0210
Downstream MH
C 0209
Dir. of Survey
Downstream
Length Surveyed
302.6 ft.
Total Length
302.6 ft.
Structural Index
2
Structural Quick
2300
Structural Rating
6
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
6
Pipe schematic from manhole C 0210 to C 0209
MH: C 0210MH: C 0209downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 3:15AM0 ft. MWM - Water Mark, 30 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE2 ft. MGO - General Observation - MAG COAT 95% START84.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CONCRETE213.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CONCRETE302.1 ft. MGO - General Observation - MAG COAT 95% FINISH302.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING CONCRETE302.6 ft. AMH - Downstream Manhole, Survey Ends - 3:35AM

Observation photos (4)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

  • General Observation - MAG COAT 95% START

    2 ft. - General Observation - MAG COAT 95% START

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CONCRETE

    84.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CONCRETE

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CONCRETE

    213.6 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CONCRETE

Observations (10)

DistanceCodeObservation
302.1MGOMAG COAT 95% FINISH
213.6SSSBLISTERING PEELING CONCRETE
0MWL
0AMH3:15AM
84.1SSSBLISTERING PEELING CONCRETE
302.1SSSBLISTERING PEELING CONCRETE
2SSSBLISTERING PEELING CONCRETE
2MGOMAG COAT 95% START
0MWM
302.6AMH3:35AM

Properties (6)

custom_field_three
BLISTERING PEELING CONCRETE-95% MAG COAT
custom_field_two
3
customer
LACSD
datetime
2021-07-13T03:09:23-07:00
documentation
MARTIN,OLIVER 111,BARR,RAMIERZ
is_lateral_inspection
false