Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 20, 2021, 04:48 PM
  • 05 1170_05 1169_7202021_100000.mp4

  • 05 1170_05 1169_7202021_101901.mp4

Date
07/20/2021
W/O
0906762
Weather
Dry
Operator/Surveyor
SANTIAGO OBREGON
Sewer ID
Z00549
PipeID
P06407
Time
9:48 AM
Certificate
U-1014-06022541
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1882
Sewer Name
05 135TH STREET TRUNK
City
GARDENA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
14
Purpose
Capital Improvement Program Assesment
Project
20210720SHO_135TH_STREET_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Upstream MH
05 1170
Downstream MH
05 1169
Dir. of Survey
Downstream
Length Surveyed
602.6 ft.
Total Length
602.6 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
3
Pipe schematic from manhole 05 1170 to 05 1169
MH: 05 1170MH: 05 1169downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - MH 117013.7 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SLIGHT AMOUNT OF CRACKS THROUGHOUT599.7 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish602.6 ft. AMH - Downstream Manhole, Survey Ends - MH 1169

Observations (6)

DistanceCodeObservation
13.7CMSLIGHT AMOUNT OF CRACKS THROUGHOUT
0MWL
599.7CM
602.6AMHMH 1169
0MWM
0AMHMH 1170

Properties (6)

additional_info
RFIR
custom_field_two
3
customer
LACSD
datetime
2021-07-20T09:48:42-07:00
documentation
OBREGON, IGNACIO, RUVALCABA, CASTILLO
is_lateral_inspection
false