Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 22, 2021, 08:05 AM
  • B 0441_B 0440_06222021_011747.mp4

Date
06/22/2021
W/O
896722
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00093
PipeID
P08953
Time
1:05 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8950
Sewer Name
B JOINT OUTFALL B - UNIT 5C
City
PASADENA
Loc. details
Sidewalk
Location Code
F
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
11
Purpose
Routine Assessment
Project
RFIR_WO_896722_TV16034_JUN2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
57 in.
Upstream MH
B 0441
Downstream MH
B 0440
Dir. of Survey
Downstream
Length Surveyed
382.8 ft.
Total Length
382.8 ft.
Structural Index
3
Structural Quick
3N2J
Structural Rating
334
O&M Index
2
O&M Quick
2N1M
O&M Rating
222
Overall Index
2
Overall Quick
Overall Rating
556
Pipe schematic from manhole B 0441 to B 0440
MH: B 0441MH: B 0440downstream0 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - B 04410 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start30.3 ft. RFJ - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YESR, Start47.9 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"84.9 ft. RFJ - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YESR, Finish113.1 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start250.3 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"307.4 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"380 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish380 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish380 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish382.8 ft. MGO - General Observation - COCKROACHES IN MANHOLE382.8 ft. AMH - Downstream Manhole, Survey Ends - B 0440

Observation photos (5)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YESR, Start

    30.3 ft. - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YESR, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    113.1 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    382.8 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (18)

DistanceCodeObservation
380DAGS
47.9TBA
307.4TBA
0MGOCOCKROACHES IN MANHOLE
2SAP
0MWL
382.8MGOCOCKROACHES IN MANHOLE
380SSS
382.8AMHB 0440
250.3TBA
84.9RFJ
2DAGS
380SAP
30.3RFJ
113.1SSS
0MWM
0AMHB 0441
0MGOCONNECTION AT MH 3 O'CLOCK

Properties (7)

additional_info
630069062121203
custom_field_three
PROJECTING AGGREGATE/SPALLING
custom_field_two
2
customer
1
datetime
2021-06-22T01:05:52-07:00
documentation
PRO PIPE
is_lateral_inspection
false