Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 11, 2021, 10:26 AM
  • 15 0708_15 0707_06112021_033712.mp4

Date
06/11/2021
W/O
896391
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00602
PipeID
P12600
Time
3:26 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8984
Sewer Name
15 EL MONTE AVENUE TRUNK
City
ARCADIA
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
08
Purpose
Routine Assessment
Project
WO_896391_TV15081_JUN2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
15 0707
Downstream MH
15 0708
Dir. of Survey
Upstream
Length Surveyed
330.4 ft.
Total Length
330.4 ft.
Structural Index
3
Structural Quick
3G21
Structural Rating
119
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
119
Pipe schematic from manhole 15 0707 to 15 0708
MH: 15 0707MH: 15 0708upstream0 ft. AMH - Upstream Manhole, Survey Ends - 15 0708112.5 ft. CL - Crack Longitudinal, at 10 o'clock, within 8 inches of joint: YES123.5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish319 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start330.4 ft. MWL - Water Level, 25 %of cross sectional area330.4 ft. AMH - Downstream Manhole, Survey Begins - 15 0707330.4 ft. MWM - Water Mark, 30 %of cross sectional area

Observation photos (2)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    11.4 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Crack Longitudinal, at 10 o'clock, within 8 inches of joint: YES

    217.9 ft. - Crack Longitudinal, at 10 o'clock, within 8 inches of joint: YES

Observations (7)

DistanceCodeObservation
206.9CM
217.9CL
0MWL
0AMH15 0707
0MWM
11.4CM
330.4AMH15 0708

Properties (6)

custom_field_three
MULTIPLE CRACKS
custom_field_two
3
customer
1
datetime
2021-06-11T03:26:20-07:00
documentation
PRO PIPE
is_lateral_inspection
false