Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 14, 2021, 09:31 AM
  • 15 0700_15 0699_06142021_024449.mp4

Date
06/14/2021
W/O
896391
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00602
PipeID
P12592
Time
2:31 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8985
Sewer Name
15 EL MONTE AVENUE TRUNK
City
ARCADIA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
08
Purpose
Routine Assessment
Project
WO_896391_TV15081_JUN2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
15 0700
Downstream MH
15 0699
Dir. of Survey
Downstream
Length Surveyed
266.2 ft.
Total Length
266.2 ft.
Structural Index
3
Structural Quick
3C00
Structural Rating
66
O&M Index
2
O&M Quick
2200
O&M Rating
4
Overall Index
3
Overall Quick
Overall Rating
70
Pipe schematic from manhole 15 0700 to 15 0699
MH: 15 0700MH: 15 0699downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 15 07000 ft. MWM - Water Mark, 35 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start18 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6"21.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"104.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6"136.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6"137.5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES162.4 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start266.2 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK266.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish266.2 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK266.2 ft. AMH - Downstream Manhole, Survey Ends - 15 0699266.2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    137.5 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    162.4 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (15)

DistanceCodeObservation
104.9TF
266.2MGOCONNECTION AT MH 3 O'CLOCK
266.2DAGS
136.4TF
0MWL
2DAGS
266.2MGOCONNECTION AT MH 9 O'CLOCK
266.2AMH15 0699
266.2CM
162.4CM
21.1TFC
137.5CM
18TF
0AMH15 0700
0MWM

Properties (6)

custom_field_three
multiple cracks
custom_field_two
3
customer
1
datetime
2021-06-14T02:31:35-07:00
documentation
PRO PIPE
is_lateral_inspection
false