Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 14, 2021, 10:06 AM
  • 15 0697_15 0696_06142021_031826.mp4

Date
06/14/2021
W/O
896391
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00602
PipeID
P12589
Time
3:06 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8985
Sewer Name
15 EL MONTE AVENUE TRUNK
City
ARCADIA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
08
Purpose
Routine Assessment
Project
WO_896391_TV15081_JUN2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
15 0697
Downstream MH
15 0696
Dir. of Survey
Downstream
Length Surveyed
207 ft.
Total Length
207 ft.
Structural Index
3
Structural Quick
3E21
Structural Rating
89
O&M Index
2
O&M Quick
2G00
O&M Rating
82
Overall Index
2
Overall Quick
Overall Rating
171
Pipe schematic from manhole 15 0697 to 15 0696
MH: 15 0697MH: 15 0696downstream0 ft. AMH - Upstream Manhole, Survey Begins - 15 06970 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0 ft. MWL - Water Level, 10 %of cross sectional area2.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start46.4 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES52.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"57.9 ft. CL - Crack Longitudinal, at 03 o'clock, within 8 inches of joint: YES66.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6"69.2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start86.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"158.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6"207 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK207 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish207 ft. AMH - Downstream Manhole, Survey Ends - 15 0696207 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2.5 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    46.4 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Crack Longitudinal, at 03 o'clock, within 8 inches of joint: YES

    57.9 ft. - Crack Longitudinal, at 03 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    69.2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (16)

DistanceCodeObservation
86.3TFC
0AMH15 0697
46.4CM
0MWM
207MGOCONNECTION AT MH 9 O'CLOCK
0MGOCONNECTION AT MH 3 O'CLOCK
207CM
207AMH15 0696
207DAGS
158.4TF
0MWL
69.2CM
2.5DAGS
57.9CL
52.2TFC
66.9TF

Properties (6)

custom_field_three
multiple cracks
custom_field_two
3
customer
1
datetime
2021-06-14T03:06:38-07:00
documentation
PRO PIPE
is_lateral_inspection
false