Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 21, 2021, 08:21 AM
  • 15 0693_15 0692_06212021_013305.mp4

Date
06/21/2021
W/O
896391
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00602
PipeID
P12585
Time
1:21 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8989
Sewer Name
15 EL MONTE AVENUE TRUNK
City
ARCADIA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
08
Purpose
Routine Assessment
Project
WO_896391_TV15081_JUN2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
15 0693
Downstream MH
15 0692
Dir. of Survey
Downstream
Length Surveyed
167.4 ft.
Total Length
167.4 ft.
Structural Index
3
Structural Quick
3300
Structural Rating
9
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
11
Pipe schematic from manhole 15 0693 to 15 0692
MH: 15 0693MH: 15 0692downstream0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 15 06932 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"8.6 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES22.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"24 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start87 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6"129.5 ft. FS - Fracture Spiral, from 02 to 05 o'clock, within 8 inches of joint: YES131.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"158.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6"165.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish165.5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish167.4 ft. AMH - Downstream Manhole, Survey Ends - 15 0692

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    8.6 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    24 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Fracture Spiral, from 02 to 05 o'clock, within 8 inches of joint: YES

    129.5 ft. - Fracture Spiral, from 02 to 05 o'clock, within 8 inches of joint: YES

Observations (16)

DistanceCodeObservation
24CM
167.4AMH15 0692
22.1TFC
0MGOCONNECTION AT MH 3 O'CLOCK
0MWL
8.6CM
0MWM
129.5FS
165.5DAGS
2DAGS
87TF
165.5CM
158.4TF
7TFC
0AMH15 0693
131.1TFC

Properties (6)

custom_field_three
MULTIPLE CRACKS
custom_field_two
3
customer
1
datetime
2021-06-21T01:21:40-07:00
documentation
PRO PIPE
is_lateral_inspection