Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 21, 2021, 09:08 AM
  • 15 0690_15 0689_06212021_023514.mp4

Date
06/21/2021
W/O
896391
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00602
PipeID
P12582
Time
2:08 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8989
Sewer Name
15 EL MONTE AVENUE TRUNK
City
ARCADIA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
08
Purpose
Routine Assessment
Project
WO_896391_TV15081_JUN2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
15 0690
Downstream MH
15 0689
Dir. of Survey
Downstream
Length Surveyed
374.8 ft.
Total Length
374.8 ft.
Structural Index
3
Structural Quick
3221
Structural Rating
8
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
10
Pipe schematic from manhole 15 0690 to 15 0689
MH: 15 0690MH: 15 0689downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 15 06900 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK2.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start5.4 ft. CM - Crack Multiple, from 11 to 05 o'clock, within 8 inches of joint: YES9.6 ft. CL - Crack Longitudinal, at 02 o'clock, within 8 inches of joint: YES17.2 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 6"19.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6"20.6 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start79.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"156.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6"171.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6"219.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"255.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"258.3 ft. TB - Tap Break-In, at 09 o'clock, -, within 8 inches of joint: YES, 6"372.6 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish372.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish374.8 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK374.8 ft. AMH - Downstream Manhole, Survey Ends - 15 0689374.8 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK

Observation photos (6)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2.1 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 11 to 05 o'clock, within 8 inches of joint: YES

    5.4 ft. - Crack Multiple, from 11 to 05 o'clock, within 8 inches of joint: YES

  • Crack Longitudinal, at 02 o'clock, within 8 inches of joint: YES

    9.6 ft. - Crack Longitudinal, at 02 o'clock, within 8 inches of joint: YES

  • Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 6"

    17.2 ft. - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 6"

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    20.6 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In, at 09 o'clock, -, within 8 inches of joint: YES, 6"

    258.3 ft. - Tap Break-In, at 09 o'clock, -, within 8 inches of joint: YES, 6"

Observations (21)

DistanceCodeObservation
20.6CM
255.3TFC
156.2TF
2.1DAGS
374.8MGOCONNECTION AT MH 9 O'CLOCK
0MWL
372.6CM
0MWM
9.6CL
171.6TF
374.8AMH15 0689
372.6DAGS
17.2TB
5.4CM
19.1TF
0AMH15 0690
374.8MGOCONNECTION AT MH 3 O'CLOCK
258.3TB
0MGOCONNECTION AT MH 9 O'CLOCK
219.7TFC
79.5TFC

Properties (6)

custom_field_three
MULTIPLE CRACKS
custom_field_two
3
customer
1
datetime
2021-06-21T02:08:57-07:00
documentation
PRO PIPE
is_lateral_inspection
false