Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 21, 2021, 10:29 AM
  • 15 0687_15 0686_06212021_034151.mp4

Date
06/21/2021
W/O
896391
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00602
PipeID
P12579
Time
3:29 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8989
Sewer Name
15 EL MONTE AVENUE TRUNK
City
ARCADIA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
11
Purpose
Routine Assessment
Project
WO_896391_TV15081_JUN2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
15 0687
Downstream MH
15 0686
Dir. of Survey
Downstream
Length Surveyed
255.3 ft.
Total Length
255.3 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole 15 0687 to 15 0686
MH: 15 0687MH: 15 0686downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 15 06872.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start9 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start22.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"92.5 ft. TB - Tap Break-In, at 03 o'clock, -, within 8 inches of joint: YES, 6"94.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"97.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"166.9 ft. TB - Tap Break-In, at 01 o'clock, -, within 8 inches of joint: YES, 6"253.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish253.2 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish255.3 ft. AMH - Downstream Manhole, Survey Ends - 15 0686255.3 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2.4 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    9 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In, at 03 o'clock, -, within 8 inches of joint: YES, 6"

    92.5 ft. - Tap Break-In, at 03 o'clock, -, within 8 inches of joint: YES, 6"

  • Tap Break-In, at 01 o'clock, -, within 8 inches of joint: YES, 6"

    166.9 ft. - Tap Break-In, at 01 o'clock, -, within 8 inches of joint: YES, 6"

Observations (16)

DistanceCodeObservation
253.2DAGS
253.2CM
0MWL
255.3AMH15 0686
0MWM
2.4DAGS
255.3MGOCONNECTION AT MH 9 O'CLOCK
0MGOCONNECTION AT MH 9 O'CLOCK
0MGOCONNECTION AT MH 3 O'CLOCK
166.9TB
0AMH15 0687
9CM
94.8TFC
97.6TFC
92.5TB
22.7TFC

Properties (6)

custom_field_three
MULTIPLE CRACKS
custom_field_two
3
customer
1
datetime
2021-06-21T03:29:02-07:00
documentation
PRO PIPE
is_lateral_inspection
false