Wastewater/Activity/PacpInspection/1.0Jun 11, 2021, 06:32 AM
  • 15 0715_15 0714_06102021_234735.mp4

Date
06/10/2021
W/O
896391
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00602
PipeID
P12607
Time
11:32 PM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8984
Sewer Name
15 EL MONTE AVENUE TRUNK
City
ARCADIA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
08
Purpose
Routine Assessment
Project
WO_896391_TV15081_JUN2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
15 0715
Downstream MH
15 0714
Dir. of Survey
Downstream
Length Surveyed
255.1 ft.
Total Length
255.1 ft.
Structural Index
3
Structural Quick
3H00
Structural Rating
135
O&M Index
2
O&M Quick
2I11
O&M Rating
103
Overall Index
2
Overall Quick
Overall Rating
238
Pipe schematic from manhole 15 0715 to 15 0714
MH: 15 0715MH: 15 0714downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 15 07150 ft. MWM - Water Mark, 30 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start8.8 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES39.1 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start109.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6"110.8 ft. FS - Fracture Spiral, from 06 to 07 o'clock, within 8 inches of joint: YES136.9 ft. RFC - Roots Fine Connection, at 11 o'clock137.2 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 6"148.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"178.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6"223.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6"255.1 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish255.1 ft. AMH - Downstream Manhole, Survey Ends - 15 0714255.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish

Observation photos (6)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    8.8 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    39.1 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Fracture Spiral, from 06 to 07 o'clock, within 8 inches of joint: YES

    110.8 ft. - Fracture Spiral, from 06 to 07 o'clock, within 8 inches of joint: YES

  • Roots Fine Connection, at 11 o'clock

    136.9 ft. - Roots Fine Connection, at 11 o'clock

  • Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 6"

    137.2 ft. - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 6"

Observations (16)

DistanceCodeObservation
178.2TF
0MWL
39.1CM
2DAGS
110.8FS
109.5TF
255.1CM
223.2TF
255.1AMH15 0714
137.2TB
255.1DAGS
0AMH15 0715
0MWM
148.4TFC
8.8CM
136.9RFC

Properties (6)

custom_field_three
MULTIPLE CRACKS
custom_field_two
3
customer
1
datetime
2021-06-10T23:32:28-07:00
documentation
PRO PIPE
is_lateral_inspection
false