Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 11, 2021, 11:22 AM
  • 15 0703_15 0702_06112021_044558.mp4

Date
06/11/2021
W/O
896391
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00602
PipeID
P12595
Time
4:22 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8984
Sewer Name
15 EL MONTE AVENUE TRUNK
City
ARCADIA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
08
Purpose
Routine Assessment
Project
WO_896391_TV15081_JUN2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
15 0703
Downstream MH
15 0702
Dir. of Survey
Downstream
Length Surveyed
284.5 ft.
Total Length
284.5 ft.
Structural Index
3
Structural Quick
3J28
Structural Rating
184
O&M Index
2
O&M Quick
312J
O&M Rating
115
Overall Index
2
Overall Quick
Overall Rating
299
Pipe schematic from manhole 15 0703 to 15 0702
MH: 15 0703MH: 15 0702downstream0 ft. MGO - General Observation - CONNECTION AT THE MH 3 OC'LOCK0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 15 07032 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start19.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6"115 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"218.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"243.9 ft. MWLS - Water Level, Sag in pipe, 20 %of cross sectional area, Start283.2 ft. MWLS - Water Level, Sag in pipe, 20 %of cross sectional area, Finish283.3 ft. RPP - Repair Patch, from 12 to 12 o'clock, within 8 inches of joint: YES - .284.5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish284.5 ft. AMH - Downstream Manhole, Survey Ends - 15 0702 ZOOMED IN284.5 ft. OBZ - Obstacles Other, 15 %of cross sectional area, at 06 o'clock - UNDER FLOW284.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish

Observation photos (5)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Water Level, Sag in pipe, 20 %of cross sectional area, Start

    243.9 ft. - Water Level, Sag in pipe, 20 %of cross sectional area, Start

  • Repair Patch, from 12 to 12 o'clock, within 8 inches of joint: YES - .

    283.3 ft. - Repair Patch, from 12 to 12 o'clock, within 8 inches of joint: YES - .

  • Obstacles Other, 15 %of cross sectional area, at 06 o'clock - UNDER FLOW

    284.5 ft. - Obstacles Other, 15 %of cross sectional area, at 06 o'clock - UNDER FLOW

Observations (16)

DistanceCodeObservation
0MGOCONNECTION AT THE MH 3 OC'LOCK
0MWL
284.5CM
283.3RPP.
284.5AMH15 0702 ZOOMED IN
115TFC
284.5OBZUNDER FLOW
283.2MWLS
2DAGS
218.8TFC
2CM
0MWM
19.3TF
284.5DAGS
243.9MWLS
0AMH15 0703

Properties (6)

custom_field_three
MULTIPLE CRACKS
custom_field_two
3
customer
1
datetime
2021-06-11T04:22:35-07:00
documentation
PRO PIPE
is_lateral_inspection
false