Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 22, 2021, 08:06 AM
  • 15 0682_15 0681_06222021_012304.mp4

Date
06/22/2021
W/O
896391
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00602
PipeID
P12574
Time
1:06 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8990
Sewer Name
15 EL MONTE AVENUE TRUNK
City
ARCADIA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
11
Purpose
Routine Assessment
Project
WO_896391_TV15081_JUN2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
15 0682
Downstream MH
15 0681
Dir. of Survey
Downstream
Length Surveyed
299.6 ft.
Total Length
299.6 ft.
Structural Index
3
Structural Quick
3H00
Structural Rating
141
O&M Index
2
O&M Quick
2K00
O&M Rating
118
Overall Index
2
Overall Quick
Overall Rating
259
Pipe schematic from manhole 15 0682 to 15 0681
MH: 15 0682MH: 15 0681downstream0 ft. MGO - General Observation - CONNECTION AT MH 3 OCLOCK0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 15 06822.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start12 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 6"50.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"64.4 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start105.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6"125.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6"180.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6"191.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"201.1 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 6"251.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"297.6 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish297.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish299.6 ft. AMH - Downstream Manhole, Survey Ends - 15 0681299.6 ft. MGO - General Observation - CONNECTION AT MH 9 OCOCK

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2.2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 6"

    12 ft. - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 6"

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    64.4 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 6"

    201.1 ft. - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 6"

Observations (18)

DistanceCodeObservation
201.1TB
12TB
191.7TFC
297.6CM
105.8TF
0MGOCONNECTION AT MH 3 OCLOCK
0MWL
0MWM
50.1TFC
125.1TF
299.6AMH15 0681
2.2DAGS
0AMH15 0682
299.6MGOCONNECTION AT MH 9 OCOCK
180.2TF
297.6DAGS
251.3TFC
64.4CM

Properties (6)

custom_field_three
MULTIPLE CRACKS
custom_field_two
3
customer
1
datetime
2021-06-22T01:06:35-07:00
documentation
PRO PIPE
is_lateral_inspection
false