Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 22, 2021, 10:27 AM
  • 15 0680_15 0679_06222021_033525.mp4

Date
06/22/2021
W/O
896391
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00602
PipeID
P12572
Time
3:27 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8990
Sewer Name
15 EL MONTE AVENUE TRUNK
City
ARCADIA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
11
Purpose
Routine Assessment
Project
WO_896391_TV15081_JUN2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
15 0680
Downstream MH
15 0679
Dir. of Survey
Downstream
Length Surveyed
146.6 ft.
Total Length
146.6 ft.
Structural Index
3
Structural Quick
3E00
Structural Rating
84
O&M Index
2
O&M Quick
2E00
O&M Rating
56
Overall Index
3
Overall Quick
Overall Rating
140
Pipe schematic from manhole 15 0680 to 15 0679
MH: 15 0680MH: 15 0679downstream0 ft. MGO - General Observation - CONNECTION AT MH 3 OCLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 15 06800 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 35 %of cross sectional area2.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start5.7 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start27.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"76.9 ft. TB - Tap Break-In, at 09 o'clock, -, within 8 inches of joint: YES, 6"114.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"144.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish144.6 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish146.6 ft. MGO - General Observation - CONNECTION AT MH 9 OCOCK146.6 ft. AMH - Downstream Manhole, Survey Ends - 15 0679

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2.5 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    5.7 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In, at 09 o'clock, -, within 8 inches of joint: YES, 6"

    76.9 ft. - Tap Break-In, at 09 o'clock, -, within 8 inches of joint: YES, 6"

Observations (13)

DistanceCodeObservation
76.9TB
146.6MGOCONNECTION AT MH 9 OCOCK
144.6DAGS
0MGOCONNECTION AT MH 3 OCLOCK
0AMH15 0680
5.7CM
114.9TFC
27.4TFC
0MWL
2.5DAGS
144.6CM
146.6AMH15 0679
0MWM

Properties (6)

custom_field_three
MULTIPLE CRACKS
custom_field_two
3
customer
1
datetime
2021-06-22T03:27:13-07:00
documentation
PRO PIPE
is_lateral_inspection
false