Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 22, 2021, 09:17 AM
  • 15 0677_15 0676_06222021_023038.mp4

Date
06/22/2021
W/O
896391
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00602
PipeID
P12569
Time
2:17 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8990
Sewer Name
15 EL MONTE AVENUE TRUNK
City
ARCADIA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
11
Purpose
Routine Assessment
Project
WO_896391_TV15081_JUN2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
15 0677
Downstream MH
15 0676
Dir. of Survey
Downstream
Length Surveyed
223.5 ft.
Total Length
223.5 ft.
Structural Index
3
Structural Quick
3G00
Structural Rating
126
O&M Index
2
O&M Quick
2H00
O&M Rating
88
Overall Index
2
Overall Quick
Overall Rating
214
Pipe schematic from manhole 15 0677 to 15 0676
MH: 15 0677MH: 15 0676downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 15 06772.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start10.5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start28 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"70.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6"74 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"121.6 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 6"188 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"207 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6"221 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish221 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish223.5 ft. AMH - Downstream Manhole, Survey Ends - 15 0676223.5 ft. MGO - General Observation - CONNECTION AT MH 9 OCOCK

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2.5 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    10.5 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (15)

DistanceCodeObservation
223.5AMH15 0676
188TFC
221DAGS
0MWL
0MWM
10.5CM
121.6TFA
0AMH15 0677
207TF
221CM
2.5DAGS
70.8TF
74TFC
28TFC
223.5MGOCONNECTION AT MH 9 OCOCK

Properties (6)

custom_field_three
MULTIPLE CRACKS
custom_field_two
3
customer
1
datetime
2021-06-22T02:17:11-07:00
documentation
PRO PIPE
is_lateral_inspection
false