Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 24, 2021, 08:02 AM
  • 15 0732_15 0731_06242021_012135.mp4

Date
06/24/2021
W/O
896573
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00616
PipeID
P12625
Time
1:02 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8995
Sewer Name
15 MONROVIA OUTFALL TRUNK
City
MONROVIA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
09
Purpose
Routine Assessment
Project
WO_896573_TV15131_JUN2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
15 0732
Downstream MH
15 0731
Dir. of Survey
Downstream
Length Surveyed
652.2 ft.
Total Length
652.2 ft.
Structural Index
3
Structural Quick
3221
Structural Rating
8
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
8
Pipe schematic from manhole 15 0732 to 15 0731
MH: 15 0732MH: 15 0731downstream0 ft. AMH - Upstream Manhole, Survey Begins - 15 07320 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - MAG COAT13.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6"13.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start13.8 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish22.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start149.5 ft. TB - Tap Break-In, at 03 o'clock, -, within 8 inches of joint: YES, 8"154.7 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: NO, 4"154.7 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: NO, 6"221.3 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 4"221.3 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: NO, 4"649.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish649.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish652.2 ft. AMH - Downstream Manhole, Survey Ends - 15 0731652.2 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK

Observation photos (5)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COAT

    2 ft. - General Observation - MAG COAT

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    13.8 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    22.6 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In, at 03 o'clock, -, within 8 inches of joint: YES, 8"

    149.5 ft. - Tap Break-In, at 03 o'clock, -, within 8 inches of joint: YES, 8"

Observations (18)

DistanceCodeObservation
0AMH15 0732
154.7TFC
649.9SSS
2SAV
22.6SSS
13.8TF
13.8SAP
149.5TB
13.8SAV
0MWM
652.2AMH15 0731
649.9SAP
0MWL
221.3TFC
652.2MGOCONNECTION AT MH 3 O'CLOCK
154.7TF
2MGOMAG COAT
221.3TFC

Properties (6)

custom_field_three
AGGREGATE PROJECTING, SPALLING
custom_field_two
3
customer
1
datetime
2021-06-24T01:02:22-07:00
documentation
PRO PIPE
is_lateral_inspection
false