15 0728_15 0727_06242021_015612.mp4
2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
21.4 ft. - Surface Reinforcement Visible, from 08 to 11 o'clock, within 8 inches of joint: YES
27.3 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
27.3 ft. - General Observation - MAG COAT
184.6 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
257 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
354.4 ft. - Surface Reinforcement Visible, at 09 o'clock, within 8 inches of joint: YES
| Distance | Code | Observation |
|---|---|---|
| 0 | MGO | CONNECTION AT MH 3 O'CLOCK |
| 450.6 | SAP | — |
| 248.6 | SRV | — |
| 168.6 | SRV | — |
| 354.4 | SRV | — |
| 27.3 | SRV | — |
| 2 | SAP | — |
| 0 | MWM | — |
| 257 | SSS | — |
| 184.6 | SRV | — |
| 21.4 | SRV | — |
| 450.6 | SSS | — |
| 27.3 | MGO | MAG COAT |
| 454.6 | MGO | CONNECTION AT MH 9 O'CLOCK |
| 0 | MWL | — |
| 454.6 | AMH | 15 0727 |
| 0 | AMH | 15 0728 |