15 0723_15 0722_06242021_025108.mp4
2.3 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2.3 ft. - General Observation - MAG COAT
4.5 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES
16.2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
16.2 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
16.2 ft. - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 8"
53.3 ft. - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 8"
| Distance | Code | Observation |
|---|---|---|
| 54 | SRV | — |
| 0 | AMH | 15 0723 |
| 2.3 | SAP | — |
| 54.4 | MGO | CONNECTION AT MH 9 O'CLOCK |
| 16.2 | SSS | — |
| 54.4 | MGO | CONNECTION AT MH 9 O'CLOCK |
| 4.5 | SRV | — |
| 0 | MGO | CONNECTION AT MH 3 O'CLOCK |
| 16.2 | SRV | — |
| 54 | SAP | — |
| 54 | SSS | — |
| 2.3 | MGO | MAG COAT |
| 53.3 | TB | — |
| 0 | MWM | — |
| 0 | MWL | — |
| 16.2 | TB | — |
| 54.4 | AMH | 15 0722 |