Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 25, 2021, 05:19 AM
  • 22 0488_22 0487_06242021_224920.mp4

Date
06/24/2021
W/O
896390
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00800
PipeID
P16827
Time
10:19 PM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8996
Sewer Name
22 COVINA CONNECTION EXTENSION TRUNK
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
31
Purpose
Routine Assessment
Project
RFIR_WO_896390_TV22135_JUN2021
Sewer Type
Gravity
Material
NRCP
Shape
Square
Height
10 in.
Width
10 in.
Upstream MH
22 0488
Downstream MH
22 0487
Dir. of Survey
Downstream
Length Surveyed
338.9 ft.
Total Length
338.9 ft.
Structural Index
3
Structural Quick
4433
Structural Rating
29
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
31
Pipe schematic from manhole 22 0488 to 22 0487
MH: 22 0488MH: 22 0487downstream0 ft. AMH - Upstream Manhole, Survey Begins - 22 04880 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0 ft. MWL - Water Level, 15 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start9.8 ft. CL - Crack Longitudinal, at 09 o'clock, within 8 inches of joint: YES37.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"40 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"72.3 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES88.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"91.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"108.6 ft. FM - Fracture Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES126.7 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES139.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"142.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"152.8 ft. FH2 - Fracture Longitudinal Hinge, 2, from 08 to 04 o'clock, within 8 inches of joint: YES, Start160.7 ft. FH2 - Fracture Longitudinal Hinge, 2, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish188 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"190.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"201.2 ft. FL - Fracture Longitudinal, at 02 o'clock, within 8 inches of joint: YES203.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start203.2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish238.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"241.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"289.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"292.8 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 6"336.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish336.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish336.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish338.9 ft. AMH - Downstream Manhole, Survey Ends - 22 0487

Observation photos (10)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    7 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Crack Longitudinal, at 09 o'clock, within 8 inches of joint: YES

    9.8 ft. - Crack Longitudinal, at 09 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    72.3 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES

    108.6 ft. - Fracture Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    126.7 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Fracture Longitudinal Hinge, 2, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    152.8 ft. - Fracture Longitudinal Hinge, 2, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Fracture Longitudinal, at 02 o'clock, within 8 inches of joint: YES

    201.2 ft. - Fracture Longitudinal, at 02 o'clock, within 8 inches of joint: YES

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    203.2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (32)

DistanceCodeObservation
91.5TFC
142.7TFC
7SSS
139.8TFC
292.8TFA
160.7FH2
0AMH22 0488
241.7TFC
2DAGS
0MWM
72.3FM
188TFC
336.8SSS
9.8CL
289.9TFC
37.2TFC
238.8TFC
338.9AMH22 0487
108.6FM
203.2SAP
40TFC
336.8SAP
203.2SAV
190.9TFC
88.5TFC
2SAV
336.8DAGS
152.8FH2
0MGOCONNECTION AT MH 3 O'CLOCK
201.2FL
0MWL
126.7FM

Properties (6)

custom_field_three
FRACTURES, SPALLING, AGGREGATE PROJECTING
custom_field_two
2
customer
1
datetime
2021-06-24T22:19:32-07:00
documentation
PRO PIPE
is_lateral_inspection
false