Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 7, 2021, 06:17 AM
  • 20 0212_20 0211_07062021_233201.mp4

Date
07/06/2021
W/O
896099
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00750
PipeID
P19179
Time
11:17 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9022
Sewer Name
20 20TH STREET EAST TRUNK
City
PALMDALE
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 20
Page No.
07
Purpose
Routine Assessment
Project
WO_896099_TV20003_JUN2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
10 in.
Width
10 in.
Upstream MH
20 0212
Downstream MH
20 0211
Dir. of Survey
Downstream
Length Surveyed
270.3 ft.
Total Length
270.3 ft.
Structural Index
3
Structural Quick
3I00
Structural Rating
156
O&M Index
2
O&M Quick
2J00
O&M Rating
108
Overall Index
2
Overall Quick
Overall Rating
264
Pipe schematic from manhole 20 0212 to 20 0211
MH: 20 0212MH: 20 0211downstream0 ft. AMH - Upstream Manhole, Survey Begins - 20 02120 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start5.7 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start30.9 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: NO, 6"34 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 6"80.3 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: NO, 6"83.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"131.2 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: NO, 6"134.3 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 6"180.1 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: NO, 6"183.4 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 6"231.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"234.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"267.4 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish270.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish270.3 ft. AMH - Downstream Manhole, Survey Ends - 20 0211270.3 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    5.7 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (20)

DistanceCodeObservation
267.4CM
30.9TFC
83.2TFC
0AMH20 0212
234.8TFC
231.8TFC
134.3TFC
270.3DAGS
0MGOCONNECTION AT MH 9 O'CLOCK
180.1TFC
2DAGS
80.3TFC
0MWM
34TFC
5.7CM
131.2TFC
270.3AMH20 0211
183.4TFC
270.3MGOCONNECTION AT MH 9 O'CLOCK
0MWL

Properties (7)

additional_info
630069070621201
custom_field_three
MULTIPLE CRACKS
custom_field_two
3
customer
1
datetime
2021-07-06T23:17:05-07:00
documentation
PRO PIPE
is_lateral_inspection
false