Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 8, 2021, 10:40 AM
  • C 0214_C 0213_782021_034253.mp4

Date
07/08/2021
W/O
0896123
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00124
PipeID
P09607
Time
3:40 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1866
Sewer Name
C JOINT OUTFALL C - UNIT 3E
City
LONG BEACH
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 03
Page No.
14
Purpose
Capital Improvement Program Assesment
Project
20210708MDM_JOINT_OUTFALL_C_UNIT_3E
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Upstream MH
C 0214
Downstream MH
C 0213
Dir. of Survey
Downstream
Length Surveyed
390.8 ft.
Total Length
390.8 ft.
Structural Index
2
Structural Quick
2400
Structural Rating
8
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
8
Pipe schematic from manhole C 0214 to C 0213
MH: C 0214MH: C 0213downstream0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 3:45AM0 ft. MWL - Water Level, 10 %of cross sectional area2 ft. MGO - General Observation - MAG COAT 99% START2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE UNDER MAG COAT27.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE74.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING CONCRETE320.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE345.7 ft. MGO - General Observation - 99% MAG COAT390.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING CONCRETE UNDER MAG COAT390.2 ft. MGO - General Observation - 98% MAG COAT FINISH390.8 ft. AMH - Downstream Manhole, Survey Ends - 4:10AM

Observation photos (6)

  • General Observation - MAG COAT 99% START

    2 ft. - General Observation - MAG COAT 99% START

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE UNDER MAG COAT

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE UNDER MAG COAT

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE

    27.2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING CONCRETE

    74.4 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING CONCRETE

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE

    320.8 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE

  • General Observation - 99% MAG COAT

    345.7 ft. - General Observation - 99% MAG COAT

Observations (12)

DistanceCodeObservation
0MWM
2MGOMAG COAT 99% START
0AMH3:45AM
2SSSBLISTERING PEELING CONCRETE UNDER MAG COAT
345.7MGO99% MAG COAT
390.8AMH4:10AM
0MWL
390.2SSSBLISTERING PEELING CONCRETE UNDER MAG COAT
27.2SSSPEELING CONCRETE
320.8SSSPEELING CONCRETE
74.4SSSBLISTERING CONCRETE
390.2MGO98% MAG COAT FINISH

Properties (6)

custom_field_three
BLISTERING PEELING CONCRETE UNDER 99% MAG COAT
custom_field_two
3
customer
LACSD
datetime
2021-07-08T03:40:08-07:00
documentation
MARTIN,REVELES,OLIVER 111,BARR
is_lateral_inspection
false