Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 12, 2021, 07:28 AM
  • 01 1228_01 1227_7122021_004921.mp4

Date
07/12/2021
W/O
0890879
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00217
PipeID
P02052
Time
12:28 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1868R
Sewer Name
01 SANTA FE AVENUE TRUNK
City
SOUTH GATE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
07
Purpose
Maintenance Related
Project
20210712MDM_SANTA_FE_AVENUE_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Upstream MH
01 1228
Downstream MH
01 1227
Dir. of Survey
Downstream
Length Surveyed
210.7 ft.
Total Length
210.7 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
3
O&M Quick
3511
O&M Rating
16
Overall Index
3
Overall Quick
Overall Rating
16
Pipe schematic from manhole 01 1228 to 01 1227
MH: 01 1228MH: 01 1227downstream0 ft. AMH - Upstream Manhole, Survey Begins - 12:35AM0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area180.7 ft. RFJ - Roots Fine Joint, from 02 to 04 o'clock, within 8 inches of joint: YESR - 2%183.6 ft. RMJ - Roots Medium Joint, from 02 to 10 o'clock, 15 %, within 8 inches of joint: YESR185.7 ft. RMJ - Roots Medium Joint, from 03 to 09 o'clock, 5 %, within 8 inches of joint: YESR, Start194.1 ft. RMJ - Roots Medium Joint, from 03 to 09 o'clock, 5 %, within 8 inches of joint: YESR, Finish194.1 ft. RMJ - Roots Medium Joint, from 03 to 09 o'clock, 10 %, within 8 inches of joint: YESR203.2 ft. RMJ - Roots Medium Joint, from 07 to 11 o'clock, 15 %, within 8 inches of joint: YESR207.3 ft. RMJ - Roots Medium Joint, from 02 to 05 o'clock, 15 %, within 8 inches of joint: YESR210.7 ft. AMH - Downstream Manhole, Survey Ends - 12:55AM

Observation photos (4)

  • Roots Medium Joint, from 02 to 10 o'clock, 15 %, within 8 inches of joint: YESR

    183.6 ft. - Roots Medium Joint, from 02 to 10 o'clock, 15 %, within 8 inches of joint: YESR

  • Roots Medium Joint, from 03 to 09 o'clock, 5 %, within 8 inches of joint: YESR, Start

    185.7 ft. - Roots Medium Joint, from 03 to 09 o'clock, 5 %, within 8 inches of joint: YESR, Start

  • Roots Medium Joint, from 07 to 11 o'clock, 15 %, within 8 inches of joint: YESR

    203.2 ft. - Roots Medium Joint, from 07 to 11 o'clock, 15 %, within 8 inches of joint: YESR

  • Roots Medium Joint, from 02 to 05 o'clock, 15 %, within 8 inches of joint: YESR

    207.3 ft. - Roots Medium Joint, from 02 to 05 o'clock, 15 %, within 8 inches of joint: YESR

Observations (11)

DistanceCodeObservation
0AMH12:35AM
207.3RMJ
194.1RMJ
0MWM
183.6RMJ
203.2RMJ
180.7RFJ2%
210.7AMH12:55AM
185.7RMJ
0MWL
194.1RMJ

Properties (5)

additional_info
POST ROOT EVALUATION ONLY
customer
LACSD
datetime
2021-07-12T00:28:18-07:00
documentation
MARTIN,REVELES,OLIVER 111,BARR
is_lateral_inspection
false