Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 16, 2021, 07:41 AM
  • 05 1484_05 2341_06162021_011956.mp4

Date
06/16/2021
W/O
896355
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00438
PipeID
P06710
Time
12:41 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8945
Sewer Name
05 EL NIDO TRUNK
City
REDONDO BEACH
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
23
Purpose
Routine Assessment
Project
RFIR_WO_896355_TV05300_JUN2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
24 in.
Upstream MH
05 1484
Downstream MH
05 2341
Dir. of Survey
Downstream
Length Surveyed
334.1 ft.
Total Length
334.1 ft.
Structural Index
3
Structural Quick
3L2L
Structural Rating
332
O&M Index
2
O&M Quick
2L00
O&M Rating
132
Overall Index
2
Overall Quick
Overall Rating
464
Pipe schematic from manhole 05 1484 to 05 2341
MH: 05 1484MH: 05 2341downstream0 ft. AMH - Upstream Manhole, Survey Begins - 05 14840 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area0.2 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/UNKNOWN0.2 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE2 ft. MGO - General Observation - 50% MAG COAT2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2.2 ft. CL - Crack Longitudinal, at 10 o'clock, within 8 inches of joint: YES2.2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start51.2 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"82.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN127.7 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6" - OPEN187.1 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6" - OPEN189.4 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6"200.3 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"247 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6" - OPEN279.4 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6" - OPEN332 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish334.1 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish334.1 ft. AMH - Downstream Manhole, Survey Ends - 05 2341334.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish334.1 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/OPEN

Observation photos (3)

  • Crack Longitudinal, at 10 o'clock, within 8 inches of joint: YES

    2.2 ft. - Crack Longitudinal, at 10 o'clock, within 8 inches of joint: YES

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (23)

DistanceCodeObservation
334.1SAV
2.2CL
127.7TFOPEN
279.4TFOPEN
2MGO50% MAG COAT
332DAGS
247TFOPEN
187.1TFOPEN
0AMH05 1484
2DAGS
0MWL
334.1AMH05 2341
51.2TFC
0.2MGOCONN @ MH 9 O'CLOCK/UNKNOWN
0MWM
334.1SSS
2.2SAV
82.5TFOPEN
189.4TFA
334.1MGOCONN @ MH 9 O'CLOCK/OPEN
0.2MGOCONN @ MH 3 O'CLOCK/ACTIVE
200.3TFC
2.2SSS

Properties (7)

additional_info
630074061521202
custom_field_three
AGGREGATE VISIBLE/SURFACE SPALLING
custom_field_two
2
customer
1
datetime
2021-06-16T00:41:28-07:00
documentation
PROPIPE
is_lateral_inspection
false