Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 16, 2021, 05:15 AM
  • 05 1480_05 1479_06152021_222831.mp4

Date
06/15/2021
W/O
896355
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00438
PipeID
P06704
Time
10:15 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8945
Sewer Name
05 EL NIDO TRUNK
City
REDONDO BEACH
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
23
Purpose
Routine Assessment
Project
RFIR_WO_896355_TV05300_JUN2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
27 in.
Upstream MH
05 1480
Downstream MH
05 1479
Dir. of Survey
Downstream
Length Surveyed
320.9 ft.
Total Length
320.9 ft.
Structural Index
3
Structural Quick
3X2L
Structural Rating
509
O&M Index
2
O&M Quick
2L11
O&M Rating
127
Overall Index
2
Overall Quick
Overall Rating
636
Pipe schematic from manhole 05 1480 to 05 1479
MH: 05 1480MH: 05 1479downstream0 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/CAPPED0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 05 14800 ft. MWM - Water Mark, 20 %of cross sectional area2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.6 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start86.5 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: YES, 6"164 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"218.1 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"239.9 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: YES, 4", 6"240 ft. RFC - Roots Fine Connection, at 12 o'clock318 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish318 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish320.9 ft. MGO - General Observation - (1) RAT @ MH 3 O'CLOCK320.9 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish320.9 ft. AMH - Downstream Manhole, Survey Ends - 05 1479320.9 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/CAPPED320.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (2)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.5 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.6 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (20)

DistanceCodeObservation
86.5TFA
318DAGS
320.9MGO(1) RAT @ MH 3 O'CLOCK
320.9SAV
320.9AMH05 1479
2.5SSS
0MGOCONN @ MH 3 O'CLOCK/CAPPED
320.9MGOCONN @ MH 3 O'CLOCK/CAPPED
318CM
0MWL
164TFC
0AMH05 1480
2.6SAV
240RFC
0MWM
218.1TFA
2CM
2DAGS
239.9TFA
320.9SSS

Properties (7)

additional_info
630074061521202
custom_field_three
AGGREGATE VISIBLE/SURFACE SPALLING
custom_field_two
2
customer
1
datetime
2021-06-15T22:15:22-07:00
documentation
PROPIPE
is_lateral_inspection
false