Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 16, 2021, 05:53 AM
  • 05 1477_05 1476_06152021_230601.mp4

Date
06/15/2021
W/O
896355
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00438
PipeID
P06701
Time
10:53 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8945
Sewer Name
05 EL NIDO TRUNK
City
REDONDO BEACH
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
23
Purpose
Routine Assessment
Project
RFIR_WO_896355_TV05300_JUN2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
27 in.
Upstream MH
05 1477
Downstream MH
05 1476
Dir. of Survey
Downstream
Length Surveyed
336.2 ft.
Total Length
336.2 ft.
Structural Index
3
Structural Quick
3L2L
Structural Rating
335
O&M Index
2
O&M Quick
2L00
O&M Rating
132
Overall Index
2
Overall Quick
Overall Rating
467
Pipe schematic from manhole 05 1477 to 05 1476
MH: 05 1477MH: 05 1476downstream0 ft. AMH - Upstream Manhole, Survey Begins - 05 14770 ft. MGO - General Observation - CONN @ MH 3 O'CLOC/ CAPPED0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2.9 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start26.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN78.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"81.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN124.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"127.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN164.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"179.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN227.6 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4", 6"279.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN322.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"334 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish336.2 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/CAPPED336.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish336.2 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/CAPPED336.2 ft. AMH - Downstream Manhole, Survey Ends - 05 1476336.2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (2)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.9 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.9 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (24)

DistanceCodeObservation
334DAGS
0AMH05 1477
0MGOCONN @ MH 3 O'CLOC/ CAPPED
0MWL
127.2TFOPEN
0MWM
322.2TFC
179.1TFOPEN
336.2MGOCONN @ MH 9 O'CLOCK/CAPPED
81.8TFOPEN
227.6TFA
336.2SSS
2.9SAV
336.2MGOCONN @ MH 3 O'CLOCK/CAPPED
2.9SSS
124.4TFC
279.6TFOPEN
0MGOCONN @ MH 9 O'CLOCK/ACTIVE
78.3TFC
164.4TFC
2DAGS
26.6TFOPEN
336.2AMH05 1476
336.2SAV

Properties (7)

additional_info
630074061521202
custom_field_three
AGGREGATE VISIBLE/SURFACE SPALLING
custom_field_two
3
customer
1
datetime
2021-06-15T22:53:23-07:00
documentation
PROPIPE
is_lateral_inspection
false