Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 17, 2021, 04:42 AM
  • 05 1475_05 1474_06162021_215229.mp4

Date
06/16/2021
W/O
896355
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00438
PipeID
P06699
Time
9:42 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8986
Sewer Name
05 EL NIDO TRUNK
City
REDONDO BEACH
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
23
Purpose
Routine Assessment
Project
RFIR_WO_896355_TV05300_JUN2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
27 in.
Upstream MH
05 1475
Downstream MH
05 1474
Dir. of Survey
Downstream
Length Surveyed
331 ft.
Total Length
331 ft.
Structural Index
3
Structural Quick
3L2L
Structural Rating
330
O&M Index
2
O&M Quick
2L00
O&M Rating
130
Overall Index
2
Overall Quick
Overall Rating
460
Pipe schematic from manhole 05 1475 to 05 1474
MH: 05 1475MH: 05 1474downstream0 ft. AMH - Upstream Manhole, Survey Begins - 05 14750 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2.8 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start40.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"82.6 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4", 6"140.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"163 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4" - UNKNOWN192.6 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4", 6"241.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN292.4 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4", 6"329 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish330.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish331 ft. AMH - Downstream Manhole, Survey Ends - 05 1474331 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (2)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.8 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.8 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (17)

DistanceCodeObservation
0AMH05 1475
331AMH05 1474
292.4TFA
140.4TFC
82.6TFA
329DAGS
0MWM
331SAV
2.8SAV
163TFUNKNOWN
40.4TFC
0MWL
2.8SSS
2DAGS
192.6TFA
330.9SSS
241.1TFOPEN

Properties (7)

additional_info
630074061621201
custom_field_three
AGGREGATE VISIBLE/SURFACE SPALLING
custom_field_two
2
customer
1
datetime
2021-06-16T21:42:10-07:00
documentation
PROPIPE
is_lateral_inspection
false